| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| ANCLAS DE VARILLA DE | ANCLAS DE VARILLA DE 3/8" | kg |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| REDONDO 3/4" | REDONDO 3/4" | KG | 1.100000 | $11.00 | $12.10 |
| GAS P/CORTES | GAS P/ CORTES | KG | 0.050000 | $3.96 | $0.20 |
| OXIGENO | OXIGENO | M3 | 0.010000 | $38.50 | $0.39 |
| DISCO P/DESVASTE | DISCO P DESVASTE | PZA | 0.050000 | $31.25 | $1.56 |
| PRIMER INORG. | PRIMER INORGANICO DE ZINC GALVADUR | litro | 0.015000 | $65.00 | $0.98 |
| ROSCA P/ANCLA | ROSCA P/ANCLA | PZA | 0.200000 | $40.00 | $8.00 |
| THINER | THINER | LT | 0.020000 | $12.00 | $0.24 |
| Suma de Material | $23.47 | ||||
| Mano de Obra | |||||
| CUADRILLA N° 341 | 1 of.pailero + 1 ayudante E. | JOR | 0.020284 | $731.00 | $14.82 |
| CUADRILLA 16 | (1 OF. CARPINTERO O.N. + 1 AYTE.) | jor | 0.020000 | $600.37 | $12.01 |
| Suma de Mano de Obra | $26.83 | ||||
| Herramienta | |||||
| FLETES Y MANEJOS | FLETES Y MANEJOS | (%)m | 0.015000 | $23.47 | $0.35 |
| Suma de Herramienta | $0.35 | ||||
| Equipo | |||||
| EQUIPO OXICORTE | EQUIPO DE CORTE OXIGENO-GAS | hora | 0.013880 | $13.71 | $0.19 |
| ESMERILADORA | ESMERILADORA | hora | 0.028440 | $4.58 | $0.13 |
| EQUIPO PINTURA | EQUIPO DE PINTURA IPSA | hora | 0.010000 | $14.76 | $0.15 |
| Suma de Equipo | $0.47 | ||||
| Otros | |||||
| SAND BLAST | sand blast a metal blanco | kg | 1.100000 | $3.04 | $3.34 |
| Suma de Otros | $3.34 | ||||
| Costo Directo | $54.46 |