| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| CONCRETO F-C=100 MAT | CONCRETO HECHO EN OBRA F'C=100 KG/CM2 | M3 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CEMENTO GRIS | CEMENTO NORMAL GRIS TIPO I EN SACO | TON | 0.273000 | $2,128.70 | $581.14 |
| ARENA | ARENA PARA CONSTRUCCION | M3 | 0.542000 | $65.00 | $35.23 |
| GRAVA 3/4" | GRAVA DE 3/4 " | M3 | 0.656000 | $300.00 | $196.80 |
| AGUA | AGUA DE TOMA MUNICIPAL | M3 | 0.271000 | $41.00 | $11.11 |
| Suma de Material | $824.28 | ||||
| Equipo | |||||
| REVOLVED. 1 SACO | REVOLVEDORA DE 1 SACO | HR | 0.533300 | $32.91 | $17.55 |
| Suma de Equipo | $17.55 | ||||
| Costo Directo | $841.83 |