| Clave | Descripci贸n del An谩lisis de Precio Unitario | Unidad |
| 3.0.15 | 40 cm | pza |
| Clave | Descripci贸n | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| MAT-REJ-0B | Rejilla Irving electroforjada IS-03 de 3/16x2 1/2" acabado liso galvanizado 0.806 m x 7.80. m | pza | 1.000000 | $13,552.00 | $13,552.00 |
| Suma de Material | $13,552.00 | ||||
| Auxiliar | |||||
| AUX-02 | SUMINISTRO, FABRICACION Y COLOCACION DE ESTRUCTURA METALICA LIGERA A BASE DE ANGULO DE ACERO A-36 DE 3" X 1/2" (13.99 KG/ML) INCLUYE GALVANIZADO EN CALIENTE. INCLUYE: MATERIAL, CORTES, DESPERDICIOS, SOLDADURA CON ELECTRODOS E-70, CONSUMO DE ENERGIA ELECTRICA, CONSUMO DE MATERIALES, EQUIPO Y MANO DE OBRA. | kg | 240.795000 | $31.14 | $7,498.36 |
| AUX-03 | ANCLAS DE 1 1/2" X 1/4" (3.4 KG/ML) @ 1.00 M Y 0.10 CM DE LONGITUD | KG | 1.721200 | $31.14 | $53.60 |
| AUX-09 | Suministro y colocacion de concreto F'c=250 Kg/Cm2 incluye impermeabilizante integral | m3 | 1.032600 | $1,164.05 | $1,202.00 |
| AUX-06 | Acero de Refuerzo | ton | 0.063910 | $15,975.48 | $1,020.99 |
| AUX-08 | cimbra comun | m2 | 13.768000 | $131.47 | $1,810.08 |
| Suma de Auxiliar | $11,585.02 | ||||
| Costo Directo | $25,137.02 |