| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| SISMO-F | RELLENO CON MATERIAL ELASTICO SISMOFLEX EN JUNTAS. | LT |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| ALB-RELLSISM | RELLENO CON MATERIAL ELASTICO SISMOFLEX. | LT | 1.080000 | $326.50 | $352.62 |
| ALB-RELLSISM | RELLENO CON MATERIAL ELASTICO SISMOFLEX. | LT | 1.080000 | $326.50 | $352.62 |
| Suma de Material | $705.24 | ||||
| Mano de Obra | |||||
| CUAD-001-01 | CUADRILLA No. 001 ( PEON ) | JOR | 0.020000 | $359.56 | $7.19 |
| CUAD-001-01 | CUADRILLA No. 001 ( PEON ) | JOR | 0.020000 | $359.56 | $7.19 |
| CUAD-0010-01 | CUADRILLA No. 0010 ( 1 OF. ALBAÑIL + 1 AYUDANTE ) | JOR | 0.096154 | $874.31 | $84.07 |
| CUAD-0010-01 | CUADRILLA No. 0010 ( 1 OF. ALBAÑIL + 1 AYUDANTE ) | JOR | 0.096154 | $874.31 | $84.07 |
| Suma de Mano de Obra | $182.52 | ||||
| Equipo | |||||
| EQUIPO-001 | ANDAMIOS TUBULARES | Hora | 0.200000 | $6.78 | $1.36 |
| EQUIPO-001 | ANDAMIOS TUBULARES | Hora | 0.200000 | $6.78 | $1.36 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| Suma de Equipo | $2.71 | ||||
| Costo Directo | $890.47 |