| Clave | Descripci贸n del An谩lisis de Precio Unitario | Unidad |
| SOPTUB-90/UNIC | M脡NSULA A BASE DE PERFIL UNICANAL DE 90 cms. DE LONGITUD PARA L脥NEAS EXTRACTORAS, INCLUYE: ABRAZADERAS UNICANAL PARA TUBO GALVANIZADO, DOS ANCLAS ARPONES DE 1/2" X 2 3/4", SEG脷N MARCA PROYECTO, INCLUYE: EL SUMINISTRO DE LOS MATERIALES, ACARREO DE LOS MISMOS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCI脫N. | PZA |
| Clave | Descripci贸n | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| SOPT-22 | PERFIL UNICANAL | ML | 0.900000 | $40.60 | $36.54 |
| SOPT-22 | PERFIL UNICANAL | ML | 0.900000 | $40.60 | $36.54 |
| SOPT-22 | PERFIL UNICANAL | ML | 0.900000 | $40.60 | $36.54 |
| SOPT-25 | ABRAZADERA UNICANAL | PZA | 1.000000 | $12.58 | $12.58 |
| SOPT-25 | ABRAZADERA UNICANAL | PZA | 1.000000 | $12.58 | $12.58 |
| SOPT-25 | ABRAZADERA UNICANAL | PZA | 1.000000 | $12.58 | $12.58 |
| SOPT-24 | ANCLAS ARPONES DE 1/2" X 2 3/4" | PZA | 2.000000 | $17.93 | $35.86 |
| SOPT-24 | ANCLAS ARPONES DE 1/2" X 2 3/4" | PZA | 2.000000 | $17.93 | $35.86 |
| SOPT-24 | ANCLAS ARPONES DE 1/2" X 2 3/4" | PZA | 2.000000 | $17.93 | $35.86 |
| Suma de Material | $254.94 | ||||
| Mano de Obra | |||||
| CUAD-1130-02 | CUADRILLA No. 1130 ( 1 TEC. ELECTRICISTA + 1 AYUDANTE ) | JOR | 0.140000 | $901.12 | $126.16 |
| CUAD-1130-02 | CUADRILLA No. 1130 ( 1 TEC. ELECTRICISTA + 1 AYUDANTE ) | JOR | 0.140000 | $901.12 | $126.16 |
| CUAD-1130-02 | CUADRILLA No. 1130 ( 1 TEC. ELECTRICISTA + 1 AYUDANTE ) | JOR | 0.140000 | $901.12 | $126.16 |
| Suma de Mano de Obra | $378.47 | ||||
| Equipo | |||||
| EQUIPO-001 | ANDAMIOS TUBULARES | Hora | 0.200000 | $6.78 | $1.36 |
| EQUIPO-001 | ANDAMIOS TUBULARES | Hora | 0.200000 | $6.78 | $1.36 |
| EQUIPO-001 | ANDAMIOS TUBULARES | Hora | 0.200000 | $6.78 | $1.36 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| Suma de Equipo | $4.07 | ||||
| Costo Directo | $637.48 |