| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| SOPTUB-1/4-CABLE | SOPORTE PARA TUBERIAS A BASE DE CABLE DE ACERO TRENZADO DE 1/4", INCLUYE: ABRAZADERA PARA CABLE TIPO CROSBY DE 1/2", TORNILLO CON TUERCA Y ROLDANA DE 1" Y SOPORTE DE SOLERA DE 1", SEGÚN MARCA PROYECTO, INCLUYE: ANDAMIOS, EL SUMINISTRO DE LOS MATERIALES, ACARREO DE LOS MISMOS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. | PZA |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| SOPT07 | CABLE DE ACERO TRENZADO DE 1/4" | ML | 0.800000 | $23.93 | $19.14 |
| SOPT07 | CABLE DE ACERO TRENZADO DE 1/4" | ML | 0.800000 | $23.93 | $19.14 |
| SOPT07 | CABLE DE ACERO TRENZADO DE 1/4" | ML | 0.800000 | $23.93 | $19.14 |
| SOPT08 | ABRAZADERA PARA CABLE TIPO CROSBY DE 1/2" | PZA | 1.000000 | $45.00 | $45.00 |
| SOPT08 | ABRAZADERA PARA CABLE TIPO CROSBY DE 1/2" | PZA | 1.000000 | $45.00 | $45.00 |
| SOPT08 | ABRAZADERA PARA CABLE TIPO CROSBY DE 1/2" | PZA | 1.000000 | $45.00 | $45.00 |
| SOPT09 | TORNILLO CABEZA HEXAGONAL CON TUERCA Y RONDANA DE 1" | JGO | 1.000000 | $8.07 | $8.07 |
| SOPT09 | TORNILLO CABEZA HEXAGONAL CON TUERCA Y RONDANA DE 1" | JGO | 1.000000 | $8.07 | $8.07 |
| SOPT09 | TORNILLO CABEZA HEXAGONAL CON TUERCA Y RONDANA DE 1" | JGO | 1.000000 | $8.07 | $8.07 |
| ACE-S | SOLERA ACERO A-36 | KG | 1.657000 | $16.50 | $27.34 |
| ACE-S | SOLERA ACERO A-36 | KG | 1.657000 | $16.50 | $27.34 |
| ACE-S | SOLERA ACERO A-36 | KG | 1.657000 | $16.50 | $27.34 |
| Suma de Material | $298.66 | ||||
| Mano de Obra | |||||
| CUAD-1130-02 | CUADRILLA No. 1130 ( 1 TEC. ELECTRICISTA + 1 AYUDANTE ) | JOR | 0.110000 | $901.12 | $99.12 |
| CUAD-1130-02 | CUADRILLA No. 1130 ( 1 TEC. ELECTRICISTA + 1 AYUDANTE ) | JOR | 0.110000 | $901.12 | $99.12 |
| CUAD-1130-02 | CUADRILLA No. 1130 ( 1 TEC. ELECTRICISTA + 1 AYUDANTE ) | JOR | 0.110000 | $901.12 | $99.12 |
| Suma de Mano de Obra | $297.37 | ||||
| Equipo | |||||
| EQUIPO-001 | ANDAMIOS TUBULARES | Hora | 0.100000 | $6.78 | $0.68 |
| EQUIPO-001 | ANDAMIOS TUBULARES | Hora | 0.100000 | $6.78 | $0.68 |
| EQUIPO-001 | ANDAMIOS TUBULARES | Hora | 0.100000 | $6.78 | $0.68 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| Suma de Equipo | $2.03 | ||||
| Costo Directo | $598.07 |