| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| EPL-30X30-3/8 (74.7) | SUMINISTRO, FABRICACIÓN Y MONTAJE HASTA UNA ALTURA DE 10.00 mts. DE TRABES DE PLACAS SOLDADAS V-1, INCLUYE: TRAZO, NIVELACIÓN, CORTES, AJUSTES, ACARREOS, ELEVACIÓN, SOLDADURA, PRUEBAS DE LABORATORIO, ESMERILADO, MATERIAL, MANO DE OBRA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. | KG |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| ACE-PL-2 | PLACA DE ACERO A-36 de 3/8" de esp. | KG | 1.050000 | $17.81 | $18.70 |
| ACE-PL-2 | PLACA DE ACERO A-36 de 3/8" de esp. | KG | 1.050000 | $17.81 | $18.70 |
| S-7018 | SOLDADURA EN ELECTRODOS E-7018 MCA INFRA | Kg | 0.062000 | $41.79 | $2.59 |
| S-7018 | SOLDADURA EN ELECTRODOS E-7018 MCA INFRA | Kg | 0.062000 | $41.79 | $2.59 |
| CONS-01 | OXIGENO | m3 | 0.001310 | $109.09 | $0.14 |
| CONS-01 | OXIGENO | m3 | 0.001310 | $109.09 | $0.14 |
| CONS-02 | ACETILENO | kg | 0.001226 | $136.19 | $0.17 |
| CONS-02 | ACETILENO | kg | 0.001226 | $136.19 | $0.17 |
| PBA-3 | PRUEBAS DE CALIDAD DE LAS SOLDADURAS | PZA | 0.001500 | $151.37 | $0.23 |
| PBA-3 | PRUEBAS DE CALIDAD DE LAS SOLDADURAS | PZA | 0.001500 | $151.37 | $0.23 |
| Suma de Material | $43.66 | ||||
| Mano de Obra | |||||
| CUAD-1140-01 | CUADRILLA DE SOLDADURA Y PAILERIA | JOR | 0.015800 | $950.75 | $15.02 |
| CUAD-1140-01 | CUADRILLA DE SOLDADURA Y PAILERIA | JOR | 0.015800 | $950.75 | $15.02 |
| CUAD-001-04 | CUADRILLA No. 004 (4 PEONES ) | JOR | 0.001700 | $1,438.25 | $2.45 |
| CUAD-001-04 | CUADRILLA No. 004 (4 PEONES ) | JOR | 0.001700 | $1,438.25 | $2.45 |
| Suma de Mano de Obra | $34.93 | ||||
| Equipo | |||||
| MAQ-TUB-13 | EQUIPO DE OXIACETILENO, INCLUYENDO MANGUERAS, BOQUILLAS Y MANOMETROS. MCA. ALEAR. | HOR | 0.009679 | $3.07 | $0.03 |
| MAQ-TUB-13 | EQUIPO DE OXIACETILENO, INCLUYENDO MANGUERAS, BOQUILLAS Y MANOMETROS. MCA. ALEAR. | HOR | 0.009679 | $3.07 | $0.03 |
| MAQ-TUB-03 | ESMERILADORA ELECTRICA PARA DISCO DE CORTE Y/O CARDA. | Hora | 0.011387 | $2.93 | $0.03 |
| MAQ-TUB-03 | ESMERILADORA ELECTRICA PARA DISCO DE CORTE Y/O CARDA. | Hora | 0.011387 | $2.93 | $0.03 |
| MAQ-109 | MAQUINA DE SOLDAR ELECTRICA DE 300 AMP. | Hora | 0.025621 | $12.36 | $0.32 |
| MAQ-109 | MAQUINA DE SOLDAR ELECTRICA DE 300 AMP. | Hora | 0.025621 | $12.36 | $0.32 |
| EQ-08 | CAMIONETA PICK-UP DE REDILAS DE 3.5 TON | HR | 0.004576 | $229.72 | $1.05 |
| EQ-08 | CAMIONETA PICK-UP DE REDILAS DE 3.5 TON | HR | 0.004576 | $229.72 | $1.05 |
| MAQ-GRU-08 | GRUA P&H DE 10 TON. | HOR | 0.002000 | $614.94 | $1.23 |
| MAQ-GRU-08 | GRUA P&H DE 10 TON. | HOR | 0.002000 | $614.94 | $1.23 |
| EQUIPO-001 | ANDAMIOS TUBULARES | Hora | 0.020000 | $6.78 | $0.14 |
| EQUIPO-001 | ANDAMIOS TUBULARES | Hora | 0.020000 | $6.78 | $0.14 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| Suma de Equipo | $5.59 | ||||
| Costo Directo | $84.18 |