| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| PAVI 20-0202/JC | JUNTA LONGITUDINAL DE CONTROL EN PISO, TIPO "JC" DE 5.00 mm. DE PROFUNDIDAD X 3 mm: DE ESPESOR, SELLADA CON MATERIAL ELÁSTICO , SEGÚN ESPECIFICACIONES DE PROYECTO, INCLUYE: CORTE DE LOSA CON MÁQUINA PARA LA COLOCACIÓN DE SELLADO, SUMINISTRO DE LOS MATERIALES, CORTES NECESARIOS, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. | ML. |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| SELL-MSF | SELLO MASTERFILL | LTS | 0.062000 | $219.87 | $13.63 |
| SELL-MSF | SELLO MASTERFILL | LTS | 0.062000 | $219.87 | $13.63 |
| SELL-MSF | SELLO MASTERFILL | LTS | 0.062000 | $219.87 | $13.63 |
| SELL-C | RESPALDO COLA DE RATA | ML | 1.030000 | $1.85 | $1.91 |
| SELL-C | RESPALDO COLA DE RATA | ML | 1.030000 | $1.85 | $1.91 |
| SELL-C | RESPALDO COLA DE RATA | ML | 1.030000 | $1.85 | $1.91 |
| Suma de Material | $46.61 | ||||
| Mano de Obra | |||||
| CUAD-001-01 | CUADRILLA No. 001 ( PEON ) | JOR | 0.030000 | $359.56 | $10.79 |
| CUAD-001-01 | CUADRILLA No. 001 ( PEON ) | JOR | 0.030000 | $359.56 | $10.79 |
| CUAD-001-01 | CUADRILLA No. 001 ( PEON ) | JOR | 0.030000 | $359.56 | $10.79 |
| CUAD-0010-01 | CUADRILLA No. 0010 ( 1 OF. ALBAÑIL + 1 AYUDANTE ) | JOR | 0.008000 | $874.31 | $6.99 |
| CUAD-0010-01 | CUADRILLA No. 0010 ( 1 OF. ALBAÑIL + 1 AYUDANTE ) | JOR | 0.008000 | $874.31 | $6.99 |
| CUAD-0010-01 | CUADRILLA No. 0010 ( 1 OF. ALBAÑIL + 1 AYUDANTE ) | JOR | 0.008000 | $874.31 | $6.99 |
| Suma de Mano de Obra | $53.34 | ||||
| Equipo | |||||
| MAQ-CON-13 | MAQUINA DE CORTAR CONCRETO DE DISCO DIAMANTE DE 12" DE DIAM. | HOR | 0.214000 | $53.47 | $11.44 |
| MAQ-CON-13 | MAQUINA DE CORTAR CONCRETO DE DISCO DIAMANTE DE 12" DE DIAM. | HOR | 0.214000 | $53.47 | $11.44 |
| MAQ-CON-13 | MAQUINA DE CORTAR CONCRETO DE DISCO DIAMANTE DE 12" DE DIAM. | HOR | 0.214000 | $53.47 | $11.44 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| Suma de Equipo | $34.33 | ||||
| Costo Directo | $134.28 |