| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| ACAPIE-TUB/AC | PINTURA EN TUBERÍA DE GAS, CON UNA APLICACIÓN PREVIA DE ANTICORROSIVO PRIMARIO DE CROMATO ZINC Y DOS MANOS DE PINTURA, AMBOS MARCA COMEX, INCLUYE: SUMINISTRO DE LOS MATERIALES, ACARREOS DE LOS MISMOS, MANO DE OBRA, DESPERDICIOS, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| PINT.CR2 | PINTURA PRIMARIO CROMATO DE ZINC | Litro | 0.193220 | $102.00 | $19.71 |
| PINT.CR2 | PINTURA PRIMARIO CROMATO DE ZINC | Litro | 0.193220 | $102.00 | $19.71 |
| PINT.CR2 | PINTURA PRIMARIO CROMATO DE ZINC | Litro | 0.193220 | $102.00 | $19.71 |
| PINT-CMX | PINTURA ESMALTE COMEX 100 | Litro | 0.268000 | $77.64 | $20.81 |
| PINT-CMX | PINTURA ESMALTE COMEX 100 | Litro | 0.268000 | $77.64 | $20.81 |
| PINT-CMX | PINTURA ESMALTE COMEX 100 | Litro | 0.268000 | $77.64 | $20.81 |
| PINT-11 | THINNER STD | Litro | 0.092000 | $16.86 | $1.55 |
| PINT-11 | THINNER STD | Litro | 0.092000 | $16.86 | $1.55 |
| PINT-11 | THINNER STD | Litro | 0.092000 | $16.86 | $1.55 |
| Suma de Material | $126.20 | ||||
| Mano de Obra | |||||
| CUAD-0530-01 | CUADRILLA No. 0530 ( 1 OF. PINTOR + 1 AYUDANTE ) | JOR | 0.143000 | $843.43 | $120.61 |
| CUAD-0530-01 | CUADRILLA No. 0530 ( 1 OF. PINTOR + 1 AYUDANTE ) | JOR | 0.143000 | $843.43 | $120.61 |
| CUAD-0530-01 | CUADRILLA No. 0530 ( 1 OF. PINTOR + 1 AYUDANTE ) | JOR | 0.143000 | $843.43 | $120.61 |
| Suma de Mano de Obra | $361.83 | ||||
| Equipo | |||||
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| Suma de Equipo | $0.00 | ||||
| Costo Directo | $488.03 |