| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| ARRA-MBR 2/SQ | ARRANCADOR MANUAL CLASE 2510, 220 VCA., 3 FASES, CAT. MBR-2 A PRUEBA DE EXPLOSION A UNA ALTURA DE 1.60 mts, CENTRO, MARCA SQUARE´D, INCLUYE: ANDAMIOS, SUMINISTRO E INSTALACIÓN DE MATERIALES, HERRAMIENTA, EQUIPO, MATERIALES DE CONSUMO Y MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA INSTALACIÓN Y FUNCIONAMIENTO. | PZA |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| EL-L0405 | ARRANCADOR MANUAL CLASE 2510, 220 VCA., 3 FASES, CAT. MBR-2 A PRUEBA DE EXPLOSION A UNA ALTURA DE 1.60 mts, CENTRO, MARCA SQUARE´D | PZA | 1.000000 | $8,547.70 | $8,547.70 |
| EL-L0405 | ARRANCADOR MANUAL CLASE 2510, 220 VCA., 3 FASES, CAT. MBR-2 A PRUEBA DE EXPLOSION A UNA ALTURA DE 1.60 mts, CENTRO, MARCA SQUARE´D | PZA | 1.000000 | $8,547.70 | $8,547.70 |
| EL-L0405 | ARRANCADOR MANUAL CLASE 2510, 220 VCA., 3 FASES, CAT. MBR-2 A PRUEBA DE EXPLOSION A UNA ALTURA DE 1.60 mts, CENTRO, MARCA SQUARE´D | PZA | 1.000000 | $8,547.70 | $8,547.70 |
| Suma de Material | $25,643.10 | ||||
| Mano de Obra | |||||
| CUAD-1130-02 | CUADRILLA No. 1130 ( 1 TEC. ELECTRICISTA + 1 AYUDANTE ) | JOR | 0.487000 | $901.12 | $438.85 |
| CUAD-1130-02 | CUADRILLA No. 1130 ( 1 TEC. ELECTRICISTA + 1 AYUDANTE ) | JOR | 0.487000 | $901.12 | $438.85 |
| CUAD-1130-02 | CUADRILLA No. 1130 ( 1 TEC. ELECTRICISTA + 1 AYUDANTE ) | JOR | 0.487000 | $901.12 | $438.85 |
| Suma de Mano de Obra | $1,316.54 | ||||
| Equipo | |||||
| EQUIPO-001 | ANDAMIOS TUBULARES | Hora | 1.200000 | $6.78 | $8.14 |
| EQUIPO-001 | ANDAMIOS TUBULARES | Hora | 1.200000 | $6.78 | $8.14 |
| EQUIPO-001 | ANDAMIOS TUBULARES | Hora | 1.200000 | $6.78 | $8.14 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| Suma de Equipo | $24.41 | ||||
| Costo Directo | $26,984.04 |