| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| IE-IBDN2400/4UTP-6/2 | SUMINISTRO E INSTALACIÓN DE CABLE TRENZADO IBDN GIGAFLEX 2400,QUE CUMPLA LOS REQUERIMIENTOS DEL ESTANDARD ANSI/TIA/EIA-568-B, DE 4 PARES "UTP", CATEGORÍA 6, CALIBRE 24 AWG, CMR, ACABADO DEL FORRO EN COLOR AZUL, SEGÚN MARCA PROYECTO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. | ML |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| EL-L0406 | CABLE TRENZADO IBDN GIGAFLEX 2400,QUE CUMPLA LOS REQUERIMIENTOS DEL ESTANDARD ANSI/TIA/EIA-568-B, DE 4 PARES "UTP", CATEGORÍA 6, CALIBRE 24 AWG, CMR, ACABADO DEL FORRO EN COLOR AZUL | ML | 1.020000 | $15.31 | $15.62 |
| EL-L0406 | CABLE TRENZADO IBDN GIGAFLEX 2400,QUE CUMPLA LOS REQUERIMIENTOS DEL ESTANDARD ANSI/TIA/EIA-568-B, DE 4 PARES "UTP", CATEGORÍA 6, CALIBRE 24 AWG, CMR, ACABADO DEL FORRO EN COLOR AZUL | ML | 1.020000 | $15.31 | $15.62 |
| EL-L0406 | CABLE TRENZADO IBDN GIGAFLEX 2400,QUE CUMPLA LOS REQUERIMIENTOS DEL ESTANDARD ANSI/TIA/EIA-568-B, DE 4 PARES "UTP", CATEGORÍA 6, CALIBRE 24 AWG, CMR, ACABADO DEL FORRO EN COLOR AZUL | ML | 1.020000 | $15.31 | $15.62 |
| Suma de Material | $46.85 | ||||
| Mano de Obra | |||||
| MO-012-00 | TECNICO EN SISTEMAS INFORMATICOS | JOR | 0.020000 | $882.27 | $17.65 |
| MO-012-00 | TECNICO EN SISTEMAS INFORMATICOS | JOR | 0.020000 | $882.27 | $17.65 |
| MO-012-00 | TECNICO EN SISTEMAS INFORMATICOS | JOR | 0.020000 | $882.27 | $17.65 |
| MO-007-02 | AYUDANTE ESPECIALISTA | JOR | 0.020000 | $443.27 | $8.87 |
| MO-007-02 | AYUDANTE ESPECIALISTA | JOR | 0.020000 | $443.27 | $8.87 |
| MO-007-02 | AYUDANTE ESPECIALISTA | JOR | 0.020000 | $443.27 | $8.87 |
| Suma de Mano de Obra | $79.53 | ||||
| Equipo | |||||
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| Suma de Equipo | $0.00 | ||||
| Costo Directo | $126.38 |