| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| ECIM-004AP/TRLO/10MT | CIMBRA APARENTE EN TRABES Y LOSA POR SUPERFICIE DE CONTACTO, HASTA UNA ALTURA MÁXIMA DE 10.00 mts., INCLUYE: GOTEROS, CIMBRADO, DESCIMBRADO, ACARREOS, MATERIALES, MANO DE OBRA, DESPERDICIOS, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| MAD-12 | CHAFLAN DE MADERA DE 1" | ML | 0.214000 | $5.09 | $1.09 |
| MAD-12 | CHAFLAN DE MADERA DE 1" | ML | 0.214000 | $5.09 | $1.09 |
| MAD-12 | CHAFLAN DE MADERA DE 1" | ML | 0.214000 | $5.09 | $1.09 |
| Suma de Material | $3.27 | ||||
| Mano de Obra | |||||
| CUAD-0030-02 | CUADRILLA No. 0030 ( 1 OF. CARPINTERO + 1 AYUDANTE ) | JOR | 0.180000 | $839.69 | $151.14 |
| CUAD-0030-02 | CUADRILLA No. 0030 ( 1 OF. CARPINTERO + 1 AYUDANTE ) | JOR | 0.180000 | $839.69 | $151.14 |
| CUAD-0030-02 | CUADRILLA No. 0030 ( 1 OF. CARPINTERO + 1 AYUDANTE ) | JOR | 0.180000 | $839.69 | $151.14 |
| Suma de Mano de Obra | $453.43 | ||||
| Equipo | |||||
| EQUIPO-001 | ANDAMIOS TUBULARES | Hora | 0.160000 | $6.78 | $1.08 |
| EQUIPO-001 | ANDAMIOS TUBULARES | Hora | 0.160000 | $6.78 | $1.08 |
| EQUIPO-001 | ANDAMIOS TUBULARES | Hora | 0.160000 | $6.78 | $1.08 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| Suma de Equipo | $3.25 | ||||
| Auxiliar | |||||
| CIM-001-1 | CIMBRA DE MADERA APARENTE. | M2 | 1.000000 | $194.54 | $194.54 |
| CIM-001-1 | CIMBRA DE MADERA APARENTE. | M2 | 1.000000 | $194.54 | $194.54 |
| CIM-001-1 | CIMBRA DE MADERA APARENTE. | M2 | 1.000000 | $194.54 | $194.54 |
| Suma de Auxiliar | $583.62 | ||||
| Costo Directo | $1,043.57 |