| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | | | | |
| ACE-RED1. | REDONDO LISO de 1" DE DIÁMETRO | KG | 24.600000 | $14.84 | $365.06 |
| ACE-RED1. | REDONDO LISO de 1" DE DIÁMETRO | KG | 24.600000 | $14.84 | $365.06 |
| ACE-RED1. | REDONDO LISO de 1" DE DIÁMETRO | KG | 24.600000 | $14.84 | $365.06 |
| ACE-RED1.1 | REDONDO LISO de 1.5" DE DIÁMETRO | KG | 16.576000 | $14.84 | $245.99 |
| ACE-RED1.1 | REDONDO LISO de 1.5" DE DIÁMETRO | KG | 16.576000 | $14.84 | $245.99 |
| ACE-RED1.1 | REDONDO LISO de 1.5" DE DIÁMETRO | KG | 16.576000 | $14.84 | $245.99 |
| ACE-PL-3 | PLACA DE ACERO A-36 de 1/4" de esp. | KG | 12.546000 | $17.49 | $219.43 |
| ACE-PL-3 | PLACA DE ACERO A-36 de 1/4" de esp. | KG | 12.546000 | $17.49 | $219.43 |
| ACE-PL-3 | PLACA DE ACERO A-36 de 1/4" de esp. | KG | 12.546000 | $17.49 | $219.43 |
| SOPT02 | TAQUETE DE EXPANSIÓN DE 1/4". | PZA | 12.000000 | $17.81 | $213.72 |
| SOPT02 | TAQUETE DE EXPANSIÓN DE 1/4". | PZA | 12.000000 | $17.81 | $213.72 |
| SOPT02 | TAQUETE DE EXPANSIÓN DE 1/4". | PZA | 12.000000 | $17.81 | $213.72 |
| PINT.CR2 | PINTURA PRIMARIO CROMATO DE ZINC | Litro | 0.854000 | $102.00 | $87.11 |
| PINT.CR2 | PINTURA PRIMARIO CROMATO DE ZINC | Litro | 0.854000 | $102.00 | $87.11 |
| PINT.CR2 | PINTURA PRIMARIO CROMATO DE ZINC | Litro | 0.854000 | $102.00 | $87.11 |
| PINT-CMX | PINTURA ESMALTE COMEX 100 | Litro | 1.154600 | $77.64 | $89.64 |
| PINT-CMX | PINTURA ESMALTE COMEX 100 | Litro | 1.154600 | $77.64 | $89.64 |
| PINT-CMX | PINTURA ESMALTE COMEX 100 | Litro | 1.154600 | $77.64 | $89.64 |
| S-7018 | SOLDADURA EN ELECTRODOS E-7018 MCA INFRA | Kg | 1.265700 | $41.79 | $52.89 |
| S-7018 | SOLDADURA EN ELECTRODOS E-7018 MCA INFRA | Kg | 1.265700 | $41.79 | $52.89 |
| S-7018 | SOLDADURA EN ELECTRODOS E-7018 MCA INFRA | Kg | 1.265700 | $41.79 | $52.89 |
| CONS-01 | OXIGENO | m3 | 0.210000 | $109.09 | $22.91 |
| CONS-01 | OXIGENO | m3 | 0.210000 | $109.09 | $22.91 |
| CONS-01 | OXIGENO | m3 | 0.210000 | $109.09 | $22.91 |
| CONS-02 | ACETILENO | kg | 0.180000 | $136.19 | $24.51 |
| CONS-02 | ACETILENO | kg | 0.180000 | $136.19 | $24.51 |
| CONS-02 | ACETILENO | kg | 0.180000 | $136.19 | $24.51 |
| Suma de Material | | | | $3,963.81 |
| Mano de Obra | | | | |
| CUAD-1140-01 | CUADRILLA DE SOLDADURA Y PAILERIA | JOR | 1.260000 | $950.75 | $1,197.95 |
| CUAD-1140-01 | CUADRILLA DE SOLDADURA Y PAILERIA | JOR | 1.260000 | $950.75 | $1,197.95 |
| CUAD-1140-01 | CUADRILLA DE SOLDADURA Y PAILERIA | JOR | 1.260000 | $950.75 | $1,197.95 |
| Suma de Mano de Obra | | | | $3,593.84 |
| Equipo | | | | |
| MAQ-TUB-13 | EQUIPO DE OXIACETILENO, INCLUYENDO MANGUERAS, BOQUILLAS Y MANOMETROS. MCA. ALEAR. | HOR | 1.200000 | $3.07 | $3.68 |
| MAQ-TUB-13 | EQUIPO DE OXIACETILENO, INCLUYENDO MANGUERAS, BOQUILLAS Y MANOMETROS. MCA. ALEAR. | HOR | 1.200000 | $3.07 | $3.68 |
| MAQ-TUB-13 | EQUIPO DE OXIACETILENO, INCLUYENDO MANGUERAS, BOQUILLAS Y MANOMETROS. MCA. ALEAR. | HOR | 1.200000 | $3.07 | $3.68 |
| MAQ-TUB-03 | ESMERILADORA ELECTRICA PARA DISCO DE CORTE Y/O CARDA. | Hora | 1.100000 | $2.93 | $3.22 |
| MAQ-TUB-03 | ESMERILADORA ELECTRICA PARA DISCO DE CORTE Y/O CARDA. | Hora | 1.100000 | $2.93 | $3.22 |
| MAQ-TUB-03 | ESMERILADORA ELECTRICA PARA DISCO DE CORTE Y/O CARDA. | Hora | 1.100000 | $2.93 | $3.22 |
| MAQ-109 | MAQUINA DE SOLDAR ELECTRICA DE 300 AMP. | Hora | 1.650000 | $12.36 | $20.39 |
| MAQ-109 | MAQUINA DE SOLDAR ELECTRICA DE 300 AMP. | Hora | 1.650000 | $12.36 | $20.39 |
| MAQ-109 | MAQUINA DE SOLDAR ELECTRICA DE 300 AMP. | Hora | 1.650000 | $12.36 | $20.39 |
| EQ-08 | CAMIONETA PICK-UP DE REDILAS DE 3.5 TON | HR | 0.254000 | $229.72 | $58.35 |
| EQ-08 | CAMIONETA PICK-UP DE REDILAS DE 3.5 TON | HR | 0.254000 | $229.72 | $58.35 |
| EQ-08 | CAMIONETA PICK-UP DE REDILAS DE 3.5 TON | HR | 0.254000 | $229.72 | $58.35 |
| EQUIPO-001 | ANDAMIOS TUBULARES | Hora | 4.000000 | $6.78 | $27.12 |
| EQUIPO-001 | ANDAMIOS TUBULARES | Hora | 4.000000 | $6.78 | $27.12 |
| EQUIPO-001 | ANDAMIOS TUBULARES | Hora | 4.000000 | $6.78 | $27.12 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| Suma de Equipo | | | | $338.31 |
| Costo Directo | | | | $7,895.95 |