| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| UV-418 | SUMINISTRO Y FABRICACIÓN MURETE DE CONCRETO ARMADO PARA INSTALAR EQUIPO DE CONTROL PARA ALUMBRADO PUBLICO CONCRETO f'c= 250 kg/cm2 | PZA |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CONC 250 | CONCRETO PREMEZCLADO F´c= 250 KG/CM2 TMA 25 MM | m³ | 1.606500 | $870.00 | $1,397.66 |
| Suma de Material | $1,397.66 | ||||
| Auxiliar | |||||
| EXCAVA-MAN | EXCAVACION POR MEDIO MANUAL EN CEPAS, EN MATERIAL CLASE A, MEDIDO EN BANCO, INCLUYE:MATERIALES MANO DE OBRA Y HERRAMIENTA | M3. | 0.400000 | $104.78 | $41.91 |
| Suma de Auxiliar | $41.91 | ||||
| Concepto | |||||
| 4080.02 | EN DALAS, CASTILLOS Y CERRAMIENTOS. | M2 | 6.870000 | $101.05 | $694.21 |
| 113106A | RELLENO EN ZANJAS COMPACTADO AL 95% PROCTOR CON MATERIAL PRODUCTO DE LA EXCAVACION. | M3 | 4.880000 | $98.90 | $482.63 |
| 1004.01 | CARGA A CAMION DE MATERIAL PRODUCTO DE LA EXCAVACION | M3 | 3.150000 | $8.04 | $25.33 |
| 4090.01 | SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO. | KG | 111.380000 | $16.45 | $1,832.20 |
| 113002 | PLANTILLA APISONADA AL 85% PROCTOR EN ZANJAS CON MATERIAL PRODUCTO DE EXCAVACION | M3 | 2.130000 | $69.79 | $148.65 |
| Suma de Concepto | $3,183.03 | ||||
| Costo Directo | $4,622.59 |