| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | | | | |
| POLÍN 3 1/2 X 3 1/2" | Polín 3 1/2 x 3 1/2" x 8 1/4' | pt | 0.450000 | $6.50 | $2.93 |
| POLÍN 3 1/2 X 3 1/2" | Polín 3 1/2 x 3 1/2" x 8 1/4' | pt | 0.450000 | $6.50 | $2.93 |
| POLÍN 3 1/2 X 3 1/2" | Polín 3 1/2 x 3 1/2" x 8 1/4' | pt | 0.450000 | $6.50 | $2.93 |
| POLÍN 3 1/2 X 3 1/2" | Polín 3 1/2 x 3 1/2" x 8 1/4' | pt | 0.450000 | $6.50 | $2.93 |
| POLÍN 3 1/2 X 3 1/2" | Polín 3 1/2 x 3 1/2" x 8 1/4' | pt | 0.450000 | $6.50 | $2.93 |
| POLÍN 3 1/2 X 3 1/2" | Polín 3 1/2 x 3 1/2" x 8 1/4' | pt | 0.450000 | $6.50 | $2.93 |
| POLÍN 3 1/2 X 3 1/2" | Polín 3 1/2 x 3 1/2" x 8 1/4' | pt | 0.450000 | $6.50 | $2.93 |
| POLÍN 3 1/2 X 3 1/2" | Polín 3 1/2 x 3 1/2" x 8 1/4' | pt | 0.450000 | $6.50 | $2.93 |
| Suma de Material | | | | $23.40 |
| Mano de Obra | | | | |
| CUAD OC 09 | CUAD. 1 OF. ALBAÑIL + 1 PEON | jor | 0.033330 | $633.72 | $21.12 |
| CUAD OC 09 | CUAD. 1 OF. ALBAÑIL + 1 PEON | jor | 0.033330 | $633.72 | $21.12 |
| CUAD OC 09 | CUAD. 1 OF. ALBAÑIL + 1 PEON | jor | 0.033330 | $633.72 | $21.12 |
| CUAD OC 09 | CUAD. 1 OF. ALBAÑIL + 1 PEON | jor | 0.033330 | $633.72 | $21.12 |
| CUAD OC 09 | CUAD. 1 OF. ALBAÑIL + 1 PEON | jor | 0.033330 | $633.72 | $21.12 |
| CUAD OC 09 | CUAD. 1 OF. ALBAÑIL + 1 PEON | jor | 0.033330 | $633.72 | $21.12 |
| CUAD OC 09 | CUAD. 1 OF. ALBAÑIL + 1 PEON | jor | 0.033330 | $633.72 | $21.12 |
| CUAD OC 09 | CUAD. 1 OF. ALBAÑIL + 1 PEON | jor | 0.033330 | $633.72 | $21.12 |
| Suma de Mano de Obra | | | | $168.98 |
| Equipo | | | | |
| VIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.013330 | $69.85 | $0.93 |
| VIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.013330 | $69.85 | $0.93 |
| VIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.013330 | $69.85 | $0.93 |
| VIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.013330 | $69.85 | $0.93 |
| VIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.013330 | $69.85 | $0.93 |
| VIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.013330 | $69.85 | $0.93 |
| VIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.013330 | $69.85 | $0.93 |
| VIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.013330 | $69.85 | $0.93 |
| Suma de Equipo | | | | $7.45 |
| Auxiliar | | | | |
| CONCRETO 100 H.O. | concreto hecho en obra fc=100 kg/cm2 | m3 | 0.052500 | $860.35 | $45.17 |
| CONCRETO 100 H.O. | concreto hecho en obra fc=100 kg/cm2 | m3 | 0.052500 | $860.35 | $45.17 |
| CONCRETO 100 H.O. | concreto hecho en obra fc=100 kg/cm2 | m3 | 0.052500 | $860.35 | $45.17 |
| CONCRETO 100 H.O. | concreto hecho en obra fc=100 kg/cm2 | m3 | 0.052500 | $860.35 | $45.17 |
| CONCRETO 100 H.O. | concreto hecho en obra fc=100 kg/cm2 | m3 | 0.052500 | $860.35 | $45.17 |
| CONCRETO 100 H.O. | concreto hecho en obra fc=100 kg/cm2 | m3 | 0.052500 | $860.35 | $45.17 |
| CONCRETO 100 H.O. | concreto hecho en obra fc=100 kg/cm2 | m3 | 0.052500 | $860.35 | $45.17 |
| CONCRETO 100 H.O. | concreto hecho en obra fc=100 kg/cm2 | m3 | 0.052500 | $860.35 | $45.17 |
| Suma de Auxiliar | | | | $361.35 |
| Costo Directo | | | | $561.17 |