| Clave | Descripci贸n del An谩lisis de Precio Unitario | Unidad |
| 2702-002-3 | TRABE C-02 EN VANOS DE PUERTAS EN ACCESOS A TIENDA Y ANDEN , SUBESTACION. DE SECCION 15X30, ARMADA CON 4 VAR. # 3 CON EST.@ 15 CM DEL # 2, F'C= 250 KG/CM2 | ML |
| Clave | Descripci贸n | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| ALAMBRE RECOCIDO | ALAMBRE RECOCIDO | Kg | 0.010000 | $12.00 | $0.12 |
| ACERO REF.VAR.DIAM. | ACERO DE REFUERZO | KG | 2.450000 | $8.20 | $20.09 |
| ACERO ALAM | ALAMBRON DE 1/4" | KG | 0.850000 | $10.00 | $8.50 |
| Suma de Material | $28.71 | ||||
| Mano de Obra | |||||
| CUAD OC 09 | (1 Of. Alba帽il + 1 Peon) | jor | 0.130000 | $763.77 | $99.29 |
| Suma de Mano de Obra | $99.29 | ||||
| Auxiliar | |||||
| CONCRETO F-C=250 H/O | Concreto F'c=250 Kg/cm2 RN rev 10 cmAM 3/4" | M3 | 0.050000 | $1,044.57 | $52.23 |
| ANDAMIO OC | ANDAMIO METALICO | (%)mo | 0.030000 | $0.00 | $0.00 |
| Suma de Auxiliar | $52.23 | ||||
| Concepto | |||||
| 305 | SUMINISTRO Y HABILITADO DE CIMBRA APARENTE EN TRABES, Y CORNIZAS A BASE DE TRIPLAY DE PINO DE 16MM DE ESPESOR EN ESTRUCTURA (MAXIMO 4 USOS), INCLUYE OBRA FALSA, CHAFLANES, CONSUMIBLES, DESENCOFRANTE Y DESCIMBRA DE LOS ELEMENTOS, TODOS LOS MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO, ACARREOS HORIZONTALES Y VERTICALES, DESPERDICIOS Y TODO AQUELLO NECESARIO PARA LA CORRECTA Y COMPLETA EJECUCION DE ESTE CONCEPTO, INCLUYE ADEMAS LIMPIEZA DE OBRA Y RETIRO DE SOBRANTES FUERA DE LA OBRA. (P.U.O.T.) | M2 | 0.600000 | $150.60 | $90.36 |
| Suma de Concepto | $90.36 | ||||
| Costo Directo | $270.59 |