| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 390. | REGISTRO DE REFRIGERACION DE 0.40 X 0.40 X 0.40 MTS. A BASE DE TABIQUE, INCLUYE: TAPA REGISTRO, MATERIALES, EQUIPO, HERRAMIENTA, MANO DE OBRA Y TODO LO NECESARIO PARA LA CORRECTA Y TOTAL EJECUCION DEL TRABAJO. | pza |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| MALLA 6/6 6-6 | MALLA ELECTROSOLDADA 6X6/ 6-6 | M2 | 1.400000 | $18.43 | $25.80 |
| ANGULO DIF. MEDIDAS | ANGULO METALICO | KG | 11.000000 | $10.00 | $110.00 |
| BLOCK HUECO 15X20X40 | BLOCK HUECO LISO DE 15X20X40 CM. | PZA | 10.000000 | $8.50 | $85.00 |
| ALAMBRE RECOCIDO | ALAMBRE RECOCIDO | Kg | 0.010000 | $12.00 | $0.12 |
| Suma de Material | $220.92 | ||||
| Mano de Obra | |||||
| CUAD OC 09 | (1 Of. Albañil + 1 Peon) | jor | 0.400000 | $763.77 | $305.51 |
| CUAD OC 22 | (1 Of. Hojalatero/Herrero + 1 Ayud.) | jor | 0.200000 | $800.09 | $160.02 |
| Suma de Mano de Obra | $465.53 | ||||
| Auxiliar | |||||
| CONCRETO F-C=250 H/O | Concreto F'c=250 Kg/cm2 RN rev 10 cmAM 3/4" | M3 | 0.120000 | $1,044.57 | $125.35 |
| Suma de Auxiliar | $125.35 | ||||
| Concepto | |||||
| 305 | SUMINISTRO Y HABILITADO DE CIMBRA APARENTE EN TRABES, Y CORNIZAS A BASE DE TRIPLAY DE PINO DE 16MM DE ESPESOR EN ESTRUCTURA (MAXIMO 4 USOS), INCLUYE OBRA FALSA, CHAFLANES, CONSUMIBLES, DESENCOFRANTE Y DESCIMBRA DE LOS ELEMENTOS, TODOS LOS MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO, ACARREOS HORIZONTALES Y VERTICALES, DESPERDICIOS Y TODO AQUELLO NECESARIO PARA LA CORRECTA Y COMPLETA EJECUCION DE ESTE CONCEPTO, INCLUYE ADEMAS LIMPIEZA DE OBRA Y RETIRO DE SOBRANTES FUERA DE LA OBRA. (P.U.O.T.) | M2 | 0.150000 | $150.60 | $22.59 |
| Suma de Concepto | $22.59 | ||||
| Costo Directo | $834.39 |