| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| HERR-15 | FABRICACION DE SOPORTE PARA PLAFOND DE TABLARROCA FABRICADO CON PTR DE 2" X 2" ESTE TRABAJO INCLUYE SUMINISTRO DE MATERIALES Y MANO DE OBRA INCLUYE PLACA DE 1/4" FIJADA CON TAQUETES DE 3/8" DE EXPANSION Y TENSORES SOLDADOS AL MONTE DE LA ESTRUCTURA Y APLICACION DE PRIMARIO. | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| MOTO-PTR-01 | PTR DE DIFERENTES MEDIDAS | KG | 6.170000 | $18.23 | $112.48 |
| PLACA A-36 | PLACA A-36 | KG | 0.130000 | $13.35 | $1.74 |
| GAS P/ CORTES | GAS P/ CORTES | KG | 0.055530 | $8.70 | $0.48 |
| OXIGENO | OXIGENO | M3 | 0.080000 | $19.00 | $1.52 |
| SOLDADURA E7018 | SOLDADURA E 7018 | KG | 0.161300 | $35.00 | $5.65 |
| DISCO ABRASIVO | DISCO ABRASIVO | PZA | 0.013000 | $45.00 | $0.59 |
| FLETES Y MANEJOS | FLETES Y MANEJOS | (%)m | 0.007849 | $0.00 | $0.00 |
| TAQUETES HILTI-3/8 | TAQUETES HILTI DE 3/8 | PZA | 0.560000 | $20.00 | $11.20 |
| Suma de Material | $133.65 | ||||
| Mano de Obra | |||||
| CUADRILLA N° 341 | 1 of.pailero + 1 ayudante E. | JOR | 0.012000 | $711.63 | $8.54 |
| CUADRILLA N° 342 | 1 of.soldador + 1 ayudante E. | JOR | 0.012000 | $711.63 | $8.54 |
| CUADRILLA N° 343 | 1 of.montador + 4 ayudante A. | JOR | 0.006000 | $1,363.22 | $8.18 |
| Suma de Mano de Obra | $25.26 | ||||
| Equipo | |||||
| EQUIPO DE CORTE | Equipo de corte de oxi-butano | HR | 0.080000 | $9.56 | $0.76 |
| ESMERILADORA | Esmeriladora | HR | 0.123400 | $2.88 | $0.36 |
| SOLDADORA | Soldadora Miller Mod. S64 | HR | 0.067000 | $12.48 | $0.84 |
| Suma de Equipo | $1.96 | ||||
| Auxiliar | |||||
| PRIMARIO ANTICORR | PRIMARIO ANTICORROSIVO | M2 | 0.276300 | $36.96 | $10.21 |
| Suma de Auxiliar | $10.21 | ||||
| Costo Directo | $171.08 |