| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 3.2.6 | SUMINISTRO E INSTALACIÓN DE TUBO PVC METR 200 MM C-7 C/C. | ML |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| 0750243 | TUBO HID S/M C- 7 200 MM 6M C/C | MT | 1.000000 | $240.65 | $240.65 |
| 9700142 | LUBRICANTE REXOLIT LATA500 GRS. | PZ | 0.004000 | $11.55 | $0.05 |
| Suma de Material | $240.70 | ||||
| Mano de Obra | |||||
| 1I1EI | CUADRILLA No.24 (1.00 OF. INST.+ 1.00 AY.ESP.) | jor | 0.026370 | $749.35 | $19.76 |
| Suma de Mano de Obra | $19.76 | ||||
| Herramienta | |||||
| FACHEME | Herramienta menor | (%)mo | 0.030000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Equipo | |||||
| AMAPE-039INS2 | CAMIONETA PICK UP MCA NISSAN | hora | 0.012250 | $163.91 | $2.01 |
| AMAIN-106 | Remolque cama baja | hora | 0.012250 | $4.67 | $0.06 |
| Suma de Equipo | $2.07 | ||||
| Costo Directo | $262.52 |