| Clave | Descripci贸n del An谩lisis de Precio Unitario | Unidad |
| 3101-E09 | LOSA POR EL SISTEMA DE VIGUETA Y BOVEDILLA, DE 15 CM. DE PERALTE, CONCRETO F'C=200KG/CM2 | M2 |
| Clave | Descripci贸n | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| VIGUETA DE 20 CM | VIGUETA DE CONCRETO F'C=200KG/CM2, POR EL SISTEMA DE VIGUETA Y BOVEDILLA, DE 20 CM. DE PERALTE. | ML | 3.000000 | $50.00 | $150.00 |
| CONC.PREMEZ.F-C=200 | CONCRETO PREMEZCLADO F'C= 200 KG/CM2 | M3 | 0.110000 | $991.90 | $109.11 |
| BOVEDILLA DE 15 CM | BOVEDILLA DE CONCRETO, DE 15 CM. DE PERALTE, PARA EL SISTEMA DE VIGETA Y BOVEDILLA. | PZA | 7.500000 | $6.00 | $45.00 |
| ACE#3 | ACERO DE REFUERZO DE 3/8" #3 f`y = 4200 kg/ml | KG | 4.080000 | $8.20 | $33.46 |
| ALAMBRE RECOCIDO | ALAMBRE RECOCIDO | Kg | 0.114200 | $11.00 | $1.26 |
| Suma de Material | $338.82 | ||||
| Mano de Obra | |||||
| CUAD OC 05 | CUAD. 1 ALBA脩IL + 5 PEONES | jor | 0.031250 | $2,065.33 | $64.54 |
| Suma de Mano de Obra | $64.54 | ||||
| Costo Directo | $403.36 |