| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 2702-001 | CADENA DE CERRAMIENTO CD-1, EN MUROS INTERIORES, F C= 250 KG/CM2 DE SECCION 0.15 X 0.15 MTS ARMADA CON ARMEX, INCLUYE: CIMBRA DESCIMBRA, EQUIPO, HERRAMIENTA Y MANO DE OBRA | ML |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| ALAMBRE RECOCIDO | ALAMBRE RECOCIDO | Kg | 0.010000 | $11.00 | $0.11 |
| ARMEX 15X15-4 | ARMEX 15X15-4 | ML | 1.100000 | $12.00 | $13.20 |
| Suma de Material | $13.31 | ||||
| Mano de Obra | |||||
| CUAD OC 09 | CUAD. 1 OF. ALBAÑIL + 1 PEON | jor | 0.120000 | $771.14 | $92.54 |
| Suma de Mano de Obra | $92.54 | ||||
| Auxiliar | |||||
| CONCRETO F-C=250 H/O | Concreto F'c=250 Kg/cm2 RN rev 10 cmAM 3/4" | M3 | 0.025000 | $1,057.47 | $26.44 |
| ANDAMIO OC | ANDAMIO METALICO | (%)mo | 0.030000 | $0.00 | $0.00 |
| Suma de Auxiliar | $26.44 | ||||
| Concepto | |||||
| 305 | SUMINISTRO Y HABILITADO DE CIMBRA APARENTE EN TRABES, Y CORNIZAS A BASE DE TRIPLAY DE PINO DE 16MM DE ESPESOR EN ESTRUCTURA (MAXIMO 4 USOS), INCLUYE OBRA FALSA, CHAFLANES, CONSUMIBLES, DESENCOFRANTE Y DESCIMBRA DE LOS ELEMENTOS, TODOS LOS MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO, ACARREOS HORIZONTALES Y VERTICALES, DESPERDICIOS Y TODO AQUELLO NECESARIO PARA LA CORRECTA Y COMPLETA EJECUCION DE ESTE CONCEPTO, INCLUYE ADEMAS LIMPIEZA DE OBRA Y RETIRO DE SOBRANTES FUERA DE LA OBRA. (P.U.O.T.) | M2 | 0.300000 | $150.90 | $45.27 |
| Suma de Concepto | $45.27 | ||||
| Costo Directo | $177.55 |