| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 9010698 | T CEM. 50- 25- 32 MM. | LOTE |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| 0306074 | T HID CEM. 50 MM | PZ | 1.000000 | $13.31 | $13.31 |
| 0306074 | T HID CEM. 50 MM | PZ | 1.000000 | $13.31 | $13.31 |
| 0309155 | REDUC. HID CEM. BUSH. 50- 25 MM. | PZ | 2.000000 | $5.38 | $10.76 |
| 0309155 | REDUC. HID CEM. BUSH. 50- 25 MM. | PZ | 2.000000 | $5.38 | $10.76 |
| 9700130 | LIMPIADOR .500 LTS. | PZ | 0.104000 | $17.46 | $1.82 |
| 9700130 | LIMPIADOR .500 LTS. | PZ | 0.104000 | $17.46 | $1.82 |
| 9700254 | CEMENTO 480 ML | PZ | 0.172000 | $52.91 | $9.10 |
| 9700254 | CEMENTO 480 ML | PZ | 0.172000 | $52.91 | $9.10 |
| Suma de Material | $69.97 | ||||
| Mano de Obra | |||||
| 1I1EI | CUADRILLA INSTALACION SISTEMA DE RIEGO 2(1 OF. INST.+1 AY.INST.) | jor | 0.016501 | $782.19 | $12.91 |
| 1I1EI | CUADRILLA INSTALACION SISTEMA DE RIEGO 2(1 OF. INST.+1 AY.INST.) | jor | 0.016501 | $782.19 | $12.91 |
| Suma de Mano de Obra | $25.81 | ||||
| Herramienta | |||||
| FACHEME | Herramienta menor | (%)mo | 0.030000 | $0.00 | $0.00 |
| FACHEME | Herramienta menor | (%)mo | 0.030000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Equipo | |||||
| AMAPE-039 | F-150 PICK-UP XL CAMION MOD 1999 No. Serie 3FTDF1727XMA32545 | hora | 0.002815 | $191.15 | $0.54 |
| AMAPE-039 | F-150 PICK-UP XL CAMION MOD 1999 No. Serie 3FTDF1727XMA32545 | hora | 0.002815 | $191.15 | $0.54 |
| Suma de Equipo | $1.08 | ||||
| Costo Directo | $96.86 |