| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 9010466 | T CEM. 50- 50- 50 MM. | LOTE |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| 0306074 | T HID CEM. 50 MM | PZ | 1.000000 | $13.31 | $13.31 |
| 9700130 | LIMPIADOR .500 LTS. | PZ | 0.083000 | $17.46 | $1.45 |
| 9700254 | CEMENTO 480 ML | PZ | 0.138000 | $52.91 | $7.30 |
| Suma de Material | $22.06 | ||||
| Mano de Obra | |||||
| 1I1EI | CUADRILLA INSTALACION SISTEMA DE RIEGO 2(1 OF. INST.+1 AY.INST.) | jor | 0.012474 | $782.19 | $9.76 |
| Suma de Mano de Obra | $9.76 | ||||
| Herramienta | |||||
| FACHEME | Herramienta menor | (%)mo | 0.030000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Equipo | |||||
| AMAPE-039 | F-150 PICK-UP XL CAMION MOD 1999 No. Serie 3FTDF1727XMA32545 | hora | 0.002118 | $191.15 | $0.40 |
| Suma de Equipo | $0.40 | ||||
| Costo Directo | $32.22 |