| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 9008994 | T CEM. 100-100- 38 MM. | LOTE |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| 0306103 | T HID CEM. 100 MM | PZ | 1.000000 | $102.52 | $102.52 |
| 0309296 | REDUC. HID CEM. BUSH. 100- 50 MM. | PZ | 1.000000 | $26.08 | $26.08 |
| 0309131 | REDUC. HID CEM. BUSH. 50- 38 MM. | PZ | 1.000000 | $3.43 | $3.43 |
| 9700130 | LIMPIADOR .500 LTS. | PZ | 0.263000 | $17.46 | $4.59 |
| 9700254 | CEMENTO 480 ML | PZ | 0.437000 | $52.91 | $23.12 |
| Suma de Material | $159.74 | ||||
| Mano de Obra | |||||
| 1I1EI | CUADRILLA INSTALACION SISTEMA DE RIEGO 2(1 OF. INST.+1 AY.INST.) | jor | 0.039980 | $782.19 | $31.27 |
| Suma de Mano de Obra | $31.27 | ||||
| Herramienta | |||||
| FACHEME | Herramienta menor | (%)mo | 0.030000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Equipo | |||||
| AMAPE-039 | F-150 PICK-UP XL CAMION MOD 1999 No. Serie 3FTDF1727XMA32545 | hora | 0.006819 | $191.15 | $1.30 |
| Suma de Equipo | $1.30 | ||||
| Costo Directo | $192.32 |