| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| EST-02 | PLACA DE 35 X 35 CM Y 1/2 CON ANCLAS, INCLUYE: UNA MANO DE PRIIMER ANTICORRROSIVO, MATERIAL, MANO DE OBRA Y HERRAMIENTA | JGO |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| ESTRUCTURA-04 | PLACA DE ACERO A-36 DE /4 Y DE 3/4" | KG | 24.400000 | $10.92 | $266.45 |
| ESMALTE-01 | PRIMARO ANTICORROSIVO SHERWIN WILIANS LINE KEM KROMIC DE 3 MM | LT | 0.480000 | $52.00 | $24.96 |
| ESMALTE-03 | SOLVENTE | LT | 0.240000 | $18.00 | $4.32 |
| ESMALTE-04 | LIJA DE ESMERIL | PLIEGO | 0.020000 | $9.00 | $0.18 |
| COMBUSTIBLE 06 | GAS P/ CORTES | KG | 0.100000 | $4.05 | $0.41 |
| COMBUSTIBLE | OXIGENO | M3 | 0.100000 | $29.00 | $2.90 |
| ESTRUCTURA-03 | SOLDADURA 70/18 | KG | 0.100000 | $31.00 | $3.10 |
| Suma de Material | $302.31 | ||||
| Mano de Obra | |||||
| CUADRILLA NO. 18 | (1 Of. Pintor +2 Ayudante). | JOR | 0.100000 | $805.53 | $80.55 |
| CUADRILLA NO. 42 | (1 Pailero + 1 Soldador + 2 ayudantes A). | Jor | 0.280000 | $1,436.38 | $402.19 |
| Suma de Mano de Obra | $482.74 | ||||
| Herramienta | |||||
| ANDAMIO METALICO | (%)mo | 0.030000 | $0.00 | $0.00 | |
| Suma de Herramienta | $0.00 | ||||
| Equipo | |||||
| COMPRESOR | EQUIPO PARA APLICAR PINTURA EN FRANJAS (PINTA RAYAS) | HR | 0.002000 | $101.17 | $0.20 |
| EQUIPO DE CORTE | EQUIPO DE CORTE DE OXI-ACETILENO CON ACCESORIOS HARRIS | HR | 0.001000 | $0.13 | $0.00 |
| ESMERILADORA | ESMERILADORA | HR | 0.003000 | $5.98 | $0.02 |
| MAQ. SOLDAR EST. | Soldadora Miller Dimension Mod. 652 | HR | 0.004000 | $35.34 | $0.14 |
| Suma de Equipo | $0.36 | ||||
| Costo Directo | $785.41 |