| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | | | | |
| 1900-30 | CHAFLAN DE MADERA DE PINO DE 3A. DE 1 1/2" | ml | 2.200000 | $8.86 | $19.49 |
| 1900-30 | CHAFLAN DE MADERA DE PINO DE 3A. DE 1 1/2" | ml | 2.200000 | $8.86 | $19.49 |
| 1900-30 | CHAFLAN DE MADERA DE PINO DE 3A. DE 1 1/2" | ml | 2.200000 | $8.86 | $19.49 |
| 1900-30 | CHAFLAN DE MADERA DE PINO DE 3A. DE 1 1/2" | ml | 2.200000 | $8.86 | $19.49 |
| Suma de Material | | | | $77.97 |
| Mano de Obra | | | | |
| 02-0410 | CUADRILLA No 41 ( 1 ALBAÑIL + 1 PEON ) | jor | 0.125000 | $889.79 | $111.22 |
| 02-0410 | CUADRILLA No 41 ( 1 ALBAÑIL + 1 PEON ) | jor | 0.125000 | $889.79 | $111.22 |
| 02-0410 | CUADRILLA No 41 ( 1 ALBAÑIL + 1 PEON ) | jor | 0.125000 | $889.79 | $111.22 |
| 02-0410 | CUADRILLA No 41 ( 1 ALBAÑIL + 1 PEON ) | jor | 0.125000 | $889.79 | $111.22 |
| Suma de Mano de Obra | | | | $444.90 |
| Concepto | | | | |
| 010146 | CORTE CON SIERRA EN BANQUETA DE CONCRETO ( 2.3 CM. DE PROFUNDIDAD ); INCLUYE: COSTO POR MANO DE OBRA, HERRAMIENTA Y RENTA DE EQUIPO. | ml | 1.600000 | $14.03 | $22.45 |
| 010146 | CORTE CON SIERRA EN BANQUETA DE CONCRETO ( 2.3 CM. DE PROFUNDIDAD ); INCLUYE: COSTO POR MANO DE OBRA, HERRAMIENTA Y RENTA DE EQUIPO. | ml | 1.600000 | $14.03 | $22.45 |
| 010146 | CORTE CON SIERRA EN BANQUETA DE CONCRETO ( 2.3 CM. DE PROFUNDIDAD ); INCLUYE: COSTO POR MANO DE OBRA, HERRAMIENTA Y RENTA DE EQUIPO. | ml | 1.600000 | $14.03 | $22.45 |
| 010146 | CORTE CON SIERRA EN BANQUETA DE CONCRETO ( 2.3 CM. DE PROFUNDIDAD ); INCLUYE: COSTO POR MANO DE OBRA, HERRAMIENTA Y RENTA DE EQUIPO. | ml | 1.600000 | $14.03 | $22.45 |
| 03-03 | ANCLAJE CON VARILLA ROSCADA HIT 1/2" X 4 1/4" Y ADHESIVO EPOXICO HIT HY150 TODO MCA. HILTI, INCLUYE: PERFORACION DE MURO, TUERCA Y RONDANA PLANA, MATERIALES, MANO DE OBRA ESPECIALIZADA Y HERRAMIENTA MENOR. | pieza | 4.000000 | $95.53 | $382.12 |
| 03-03 | ANCLAJE CON VARILLA ROSCADA HIT 1/2" X 4 1/4" Y ADHESIVO EPOXICO HIT HY150 TODO MCA. HILTI, INCLUYE: PERFORACION DE MURO, TUERCA Y RONDANA PLANA, MATERIALES, MANO DE OBRA ESPECIALIZADA Y HERRAMIENTA MENOR. | pieza | 4.000000 | $95.53 | $382.12 |
| 03-03 | ANCLAJE CON VARILLA ROSCADA HIT 1/2" X 4 1/4" Y ADHESIVO EPOXICO HIT HY150 TODO MCA. HILTI, INCLUYE: PERFORACION DE MURO, TUERCA Y RONDANA PLANA, MATERIALES, MANO DE OBRA ESPECIALIZADA Y HERRAMIENTA MENOR. | pieza | 4.000000 | $95.53 | $382.12 |
| 03-03 | ANCLAJE CON VARILLA ROSCADA HIT 1/2" X 4 1/4" Y ADHESIVO EPOXICO HIT HY150 TODO MCA. HILTI, INCLUYE: PERFORACION DE MURO, TUERCA Y RONDANA PLANA, MATERIALES, MANO DE OBRA ESPECIALIZADA Y HERRAMIENTA MENOR. | pieza | 4.000000 | $95.53 | $382.12 |
| 020201 | CIMBRA COMUN EN ZAPATAS CORRIDAS DE CIMENTACION DE 10 CM. DE PERALTE. INCLUYE: SUMINISTRO, HABILITADO, ARMADO, COLOCACION, ACARREOS INTERNOS, COSTO POR MANO DE OBRA, MATERIALES DE CONSUMO, EQUIPO Y HERRAMIENTA. | m2 | 1.120000 | $131.61 | $147.40 |
| 020201 | CIMBRA COMUN EN ZAPATAS CORRIDAS DE CIMENTACION DE 10 CM. DE PERALTE. INCLUYE: SUMINISTRO, HABILITADO, ARMADO, COLOCACION, ACARREOS INTERNOS, COSTO POR MANO DE OBRA, MATERIALES DE CONSUMO, EQUIPO Y HERRAMIENTA. | m2 | 1.120000 | $131.61 | $147.40 |
| 020201 | CIMBRA COMUN EN ZAPATAS CORRIDAS DE CIMENTACION DE 10 CM. DE PERALTE. INCLUYE: SUMINISTRO, HABILITADO, ARMADO, COLOCACION, ACARREOS INTERNOS, COSTO POR MANO DE OBRA, MATERIALES DE CONSUMO, EQUIPO Y HERRAMIENTA. | m2 | 1.120000 | $131.61 | $147.40 |
| 020201 | CIMBRA COMUN EN ZAPATAS CORRIDAS DE CIMENTACION DE 10 CM. DE PERALTE. INCLUYE: SUMINISTRO, HABILITADO, ARMADO, COLOCACION, ACARREOS INTERNOS, COSTO POR MANO DE OBRA, MATERIALES DE CONSUMO, EQUIPO Y HERRAMIENTA. | m2 | 1.120000 | $131.61 | $147.40 |
| 020338 | HABILITADO Y ARMADO DE MALLA DE ACERO 6 X 6-10/10 EN PISOS. INCLUYE:SUMINISTRO, ACARREOS INTERNOS, HABILITADO, ARMADO, COLOCACION, ALAMBRE RECOCIDO, COSTO POR MANO DE OBRA, EQUIPO Y HERRAMIENTA. | m2 | 0.980000 | $33.55 | $32.88 |
| 020338 | HABILITADO Y ARMADO DE MALLA DE ACERO 6 X 6-10/10 EN PISOS. INCLUYE:SUMINISTRO, ACARREOS INTERNOS, HABILITADO, ARMADO, COLOCACION, ALAMBRE RECOCIDO, COSTO POR MANO DE OBRA, EQUIPO Y HERRAMIENTA. | m2 | 0.980000 | $33.55 | $32.88 |
| 020338 | HABILITADO Y ARMADO DE MALLA DE ACERO 6 X 6-10/10 EN PISOS. INCLUYE:SUMINISTRO, ACARREOS INTERNOS, HABILITADO, ARMADO, COLOCACION, ALAMBRE RECOCIDO, COSTO POR MANO DE OBRA, EQUIPO Y HERRAMIENTA. | m2 | 0.980000 | $33.55 | $32.88 |
| 020338 | HABILITADO Y ARMADO DE MALLA DE ACERO 6 X 6-10/10 EN PISOS. INCLUYE:SUMINISTRO, ACARREOS INTERNOS, HABILITADO, ARMADO, COLOCACION, ALAMBRE RECOCIDO, COSTO POR MANO DE OBRA, EQUIPO Y HERRAMIENTA. | m2 | 0.980000 | $33.55 | $32.88 |
| 020473 | CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON CARRETILLA Y BOTES F'C=200 KG/CM2 REVENIMIENTO DE 10 CM AGREGADO MAXIMO 3/4" EN COLUMNAS Y MUROS. INCLUYE:SUMINISTRO DE MATERIALES, COSTO POR MANO DE OBRA, EQUIPO Y HERRAMIENTA. | m3 | 0.049000 | $1,695.11 | $83.06 |
| 020473 | CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON CARRETILLA Y BOTES F'C=200 KG/CM2 REVENIMIENTO DE 10 CM AGREGADO MAXIMO 3/4" EN COLUMNAS Y MUROS. INCLUYE:SUMINISTRO DE MATERIALES, COSTO POR MANO DE OBRA, EQUIPO Y HERRAMIENTA. | m3 | 0.049000 | $1,695.11 | $83.06 |
| 020473 | CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON CARRETILLA Y BOTES F'C=200 KG/CM2 REVENIMIENTO DE 10 CM AGREGADO MAXIMO 3/4" EN COLUMNAS Y MUROS. INCLUYE:SUMINISTRO DE MATERIALES, COSTO POR MANO DE OBRA, EQUIPO Y HERRAMIENTA. | m3 | 0.049000 | $1,695.11 | $83.06 |
| 020473 | CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON CARRETILLA Y BOTES F'C=200 KG/CM2 REVENIMIENTO DE 10 CM AGREGADO MAXIMO 3/4" EN COLUMNAS Y MUROS. INCLUYE:SUMINISTRO DE MATERIALES, COSTO POR MANO DE OBRA, EQUIPO Y HERRAMIENTA. | m3 | 0.049000 | $1,695.11 | $83.06 |
| PLAC-001.1 | SUMINISTRO Y COLOCACION DE PLACA DE CONEXION DE ACERO A-36 FABRICADA CON PLACA DE ¼" DE 10x70 CM DE SECCION CON DOS ANCLAS EN ANILLO A BASE DE REDONDO LISO DE 3/8" DE 85 CM. DE DESARROLLO. INCLUYE: PINTURA ALQUIDALICA, CORTES, HERRAMIENTA, EQUIPO Y MANO DE OBRA | pieza | 1.000000 | $225.58 | $225.58 |
| PLAC-001.1 | SUMINISTRO Y COLOCACION DE PLACA DE CONEXION DE ACERO A-36 FABRICADA CON PLACA DE ¼" DE 10x70 CM DE SECCION CON DOS ANCLAS EN ANILLO A BASE DE REDONDO LISO DE 3/8" DE 85 CM. DE DESARROLLO. INCLUYE: PINTURA ALQUIDALICA, CORTES, HERRAMIENTA, EQUIPO Y MANO DE OBRA | pieza | 1.000000 | $225.58 | $225.58 |
| PLAC-001.1 | SUMINISTRO Y COLOCACION DE PLACA DE CONEXION DE ACERO A-36 FABRICADA CON PLACA DE ¼" DE 10x70 CM DE SECCION CON DOS ANCLAS EN ANILLO A BASE DE REDONDO LISO DE 3/8" DE 85 CM. DE DESARROLLO. INCLUYE: PINTURA ALQUIDALICA, CORTES, HERRAMIENTA, EQUIPO Y MANO DE OBRA | pieza | 1.000000 | $225.58 | $225.58 |
| PLAC-001.1 | SUMINISTRO Y COLOCACION DE PLACA DE CONEXION DE ACERO A-36 FABRICADA CON PLACA DE ¼" DE 10x70 CM DE SECCION CON DOS ANCLAS EN ANILLO A BASE DE REDONDO LISO DE 3/8" DE 85 CM. DE DESARROLLO. INCLUYE: PINTURA ALQUIDALICA, CORTES, HERRAMIENTA, EQUIPO Y MANO DE OBRA | pieza | 1.000000 | $225.58 | $225.58 |
| Suma de Concepto | | | | $3,573.96 |
| Costo Directo | | | | $4,096.83 |