| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Auxiliar | | | | |
| 00-0021 | SUMINISTRO DE MATERIAL DE BANCO (ARENA) PUESTO EN OBRA. INCLUYE MATERIAL Y FLETE. | m3 | 0.038500 | $71.42 | $2.75 |
| 03-2040 | CONCRETO HECHO EN OBRA F'C=150 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4" | m3 | 0.055000 | $1,118.66 | $61.53 |
| Suma de Auxiliar | | | | $64.28 |
| Concepto | | | | |
| 010141 | DEMOLICION A MANO DE PAVIMENTO ASFALTICO SIN AFECTAR LA BASE. . INCLUYE :COSTO POR MANO DE OBRA Y HERRAMIENTA. NO INCLUYE ACARREOS DEL MATERIAL PRODUCTO DE LA DEMOLICION. | m2 | 0.056000 | $31.75 | $1.78 |
| 010405 | EXCAVACION A MANO EN CEPA, MATERIAL SECO, TIPO II, ZONA A, PROFUNDIDAD DE 0.00 A 2.00 M.; INCLUYE: AFINE DE TALUDES Y FONDO, COSTO POR MANO DE OBRA Y HERRAMIENTA. NO INCLUYE CARGA Y ACARREOS DEL MATERIAL PRODUCTO DE LA EXCAVACION. | m3 | 0.584000 | $113.40 | $66.23 |
| 010704 | RELLENO COMPACTADO CON APIZONADOR VIBRATORIO (BAILARINA) CEPAS DE 20 CM. UTILIZANDO MATERIAL PRODUCTO DE LA OBRA.; INCLUYE: RENTA DE EQUIPO, COSTO POR MANO DE OBRA Y HERRAMIENTA. NO INCLUYE ACARREO DEL MATERIAL DE RELLENO. | m3 | 0.534000 | $146.76 | $78.37 |
| 010625 | ACARREO HORIZONTAL SIN PENDIENTE, DE MATERIALES PRODUCTO DE DEMOLICION, EN CARRETILLA DE 3.5 FT3 A 20.00 M. INCLUYE CARGA Y DESCARGA DEL MATERIAL, COSTO POR MANO DE OBRA.(NO INCLUYE ABUNDAMIENTO EL P.U.) | m3 | 0.240000 | $99.23 | $23.82 |
| 010626 | ACARREO HORIZONTAL SIN PENDIENTE, DE MATERIALES PRODUCTO DE DEMOLICION, EN CARRETILLA DE 3.5 FT3 A ESTACIONES SUBSECUENTES DE 20 M.(NO INCLUYE ABUNDAMIENTO EL P.U.) | m3 | 1.920000 | $21.83 | $41.91 |
| 010625 | ACARREO HORIZONTAL SIN PENDIENTE, DE MATERIALES PRODUCTO DE DEMOLICION, EN CARRETILLA DE 3.5 FT3 A 20.00 M. INCLUYE CARGA Y DESCARGA DEL MATERIAL, COSTO POR MANO DE OBRA.(NO INCLUYE ABUNDAMIENTO EL P.U.) | m3 | 0.400000 | $99.23 | $39.69 |
| 010626 | ACARREO HORIZONTAL SIN PENDIENTE, DE MATERIALES PRODUCTO DE DEMOLICION, EN CARRETILLA DE 3.5 FT3 A ESTACIONES SUBSECUENTES DE 20 M.(NO INCLUYE ABUNDAMIENTO EL P.U.) | m3 | 3.200000 | $21.83 | $69.86 |
| 060308 | BASE DE GRAVA CEMENTADA CONTROLADA DE 10 CM DE ESPESOR COMPACTO INLCUYENDO 1er KM DE ACARREO | m2 | 0.700000 | $19.34 | $13.54 |
| 060316 | CARPETA DE CONCRETO ASFALTICO TIPO PA-5 DE 5 CM DE ESPESOR COMPACTO (NO INCLUYE RIEGO) INCL. ACARREO, MATERIAL, EQUIPO, HERRAMIENTA Y MNAO DE OBRA. | m2 | 0.850000 | $111.36 | $94.66 |
| 060312A | RIEGO ASFALTICO DE LIGA O DE IMPREGNACION CON ASFALTICO FM-1 INCLUYE ACARREO DE 12 KM | m2 | 0.850000 | $8.36 | $7.11 |
| Suma de Concepto | | | | $436.95 |
| Costo Directo | | | | $501.23 |