| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| HAB-ACE-NO3 | HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA RESISTENCIA NORMAL FY=4200 KG/CM2 No. 3 DIAMETRO 3/8" INCLUYE:SUMINISTRO, ACARREOS INTERNOS, HABILITADO,ARMADO Y COLOCACION, ALAMBRE RECOCIDO, COSTO POR MANO DE OBRA, SEPARADOR DE CONCRETO PARA CALZAR ACERO, EQUIPO Y HERRAMIENTA. | ton |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| 0084-01 | VARILLA FY=4200 KG/CM2 NO. 3 ( 3/8" ) | ton | 1.070000 | $13,645.21 | $14,600.37 |
| 0084-01 | VARILLA FY=4200 KG/CM2 NO. 3 ( 3/8" ) | ton | 1.070000 | $13,645.21 | $14,600.37 |
| 0084-01 | VARILLA FY=4200 KG/CM2 NO. 3 ( 3/8" ) | ton | 1.070000 | $13,645.21 | $14,600.37 |
| 0082-05 | ALAMBRE RECOCIDO NO. 16 | kg | 28.000000 | $21.79 | $610.12 |
| 0082-05 | ALAMBRE RECOCIDO NO. 16 | kg | 28.000000 | $21.79 | $610.12 |
| 0082-05 | ALAMBRE RECOCIDO NO. 16 | kg | 28.000000 | $21.79 | $610.12 |
| Suma de Material | $45,631.48 | ||||
| Mano de Obra | |||||
| 02-0620 | CUADRILLA No 62 ( 1 FIERRERO + 1 AYUDANTE DE FIERRERO ) | jor | 6.451610 | $939.42 | $6,060.77 |
| 02-0620 | CUADRILLA No 62 ( 1 FIERRERO + 1 AYUDANTE DE FIERRERO ) | jor | 6.451610 | $939.42 | $6,060.77 |
| 02-0620 | CUADRILLA No 62 ( 1 FIERRERO + 1 AYUDANTE DE FIERRERO ) | jor | 6.451610 | $939.42 | $6,060.77 |
| Suma de Mano de Obra | $18,182.31 | ||||
| Auxiliar | |||||
| SEP-CON001 | SEPARADOR DE CONCRETO PARA CALZAR ACERO DE REFUERZO. | pieza | 40.000000 | $2.24 | $89.60 |
| SEP-CON001 | SEPARADOR DE CONCRETO PARA CALZAR ACERO DE REFUERZO. | pieza | 40.000000 | $2.24 | $89.60 |
| SEP-CON001 | SEPARADOR DE CONCRETO PARA CALZAR ACERO DE REFUERZO. | pieza | 40.000000 | $2.24 | $89.60 |
| Suma de Auxiliar | $268.80 | ||||
| Costo Directo | $64,082.60 |