| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Auxiliar | | | | |
| CIM022 | CIMBRA EN ALBAÑILERIA PARA CASTILLO, CADENA, REPIZON O CEJA A BASE DE MADERA DE PINO DE 3a. | m2 | 0.300000 | $131.31 | $39.39 |
| CIM022 | CIMBRA EN ALBAÑILERIA PARA CASTILLO, CADENA, REPIZON O CEJA A BASE DE MADERA DE PINO DE 3a. | m2 | 0.300000 | $131.31 | $39.39 |
| CIM022 | CIMBRA EN ALBAÑILERIA PARA CASTILLO, CADENA, REPIZON O CEJA A BASE DE MADERA DE PINO DE 3a. | m2 | 0.300000 | $131.31 | $39.39 |
| CIM022 | CIMBRA EN ALBAÑILERIA PARA CASTILLO, CADENA, REPIZON O CEJA A BASE DE MADERA DE PINO DE 3a. | m2 | 0.300000 | $131.31 | $39.39 |
| CIM022 | CIMBRA EN ALBAÑILERIA PARA CASTILLO, CADENA, REPIZON O CEJA A BASE DE MADERA DE PINO DE 3a. | m2 | 0.300000 | $131.31 | $39.39 |
| CIM022 | CIMBRA EN ALBAÑILERIA PARA CASTILLO, CADENA, REPIZON O CEJA A BASE DE MADERA DE PINO DE 3a. | m2 | 0.300000 | $131.31 | $39.39 |
| Suma de Auxiliar | | | | $236.36 |
| Concepto | | | | |
| 020303 | HABILITADO Y ARMADO DE ACERO DE REFUERZO EN CIMENTACION RESISTENCIA NORMAL FY=4200 KG/CM2 No. 3 DIAMETRO 3/8" INCLUYE:SUMINISTRO, ACARREOS INTERNOS, HABILITADO,ARMADO Y COLOCACION, ALAMBRE RECOCIDO, COSTO POR MANO DE OBRA, SEPARADOR DE CONCRETO PARA CALZAR ACERO, EQUIPO Y HERRAMIENTA. | ton | 0.002240 | $21,130.01 | $47.33 |
| 020303 | HABILITADO Y ARMADO DE ACERO DE REFUERZO EN CIMENTACION RESISTENCIA NORMAL FY=4200 KG/CM2 No. 3 DIAMETRO 3/8" INCLUYE:SUMINISTRO, ACARREOS INTERNOS, HABILITADO,ARMADO Y COLOCACION, ALAMBRE RECOCIDO, COSTO POR MANO DE OBRA, SEPARADOR DE CONCRETO PARA CALZAR ACERO, EQUIPO Y HERRAMIENTA. | ton | 0.002240 | $21,130.01 | $47.33 |
| 020303 | HABILITADO Y ARMADO DE ACERO DE REFUERZO EN CIMENTACION RESISTENCIA NORMAL FY=4200 KG/CM2 No. 3 DIAMETRO 3/8" INCLUYE:SUMINISTRO, ACARREOS INTERNOS, HABILITADO,ARMADO Y COLOCACION, ALAMBRE RECOCIDO, COSTO POR MANO DE OBRA, SEPARADOR DE CONCRETO PARA CALZAR ACERO, EQUIPO Y HERRAMIENTA. | ton | 0.002240 | $21,130.01 | $47.33 |
| 020303 | HABILITADO Y ARMADO DE ACERO DE REFUERZO EN CIMENTACION RESISTENCIA NORMAL FY=4200 KG/CM2 No. 3 DIAMETRO 3/8" INCLUYE:SUMINISTRO, ACARREOS INTERNOS, HABILITADO,ARMADO Y COLOCACION, ALAMBRE RECOCIDO, COSTO POR MANO DE OBRA, SEPARADOR DE CONCRETO PARA CALZAR ACERO, EQUIPO Y HERRAMIENTA. | ton | 0.002240 | $21,130.01 | $47.33 |
| 020303 | HABILITADO Y ARMADO DE ACERO DE REFUERZO EN CIMENTACION RESISTENCIA NORMAL FY=4200 KG/CM2 No. 3 DIAMETRO 3/8" INCLUYE:SUMINISTRO, ACARREOS INTERNOS, HABILITADO,ARMADO Y COLOCACION, ALAMBRE RECOCIDO, COSTO POR MANO DE OBRA, SEPARADOR DE CONCRETO PARA CALZAR ACERO, EQUIPO Y HERRAMIENTA. | ton | 0.002240 | $21,130.01 | $47.33 |
| 020303 | HABILITADO Y ARMADO DE ACERO DE REFUERZO EN CIMENTACION RESISTENCIA NORMAL FY=4200 KG/CM2 No. 3 DIAMETRO 3/8" INCLUYE:SUMINISTRO, ACARREOS INTERNOS, HABILITADO,ARMADO Y COLOCACION, ALAMBRE RECOCIDO, COSTO POR MANO DE OBRA, SEPARADOR DE CONCRETO PARA CALZAR ACERO, EQUIPO Y HERRAMIENTA. | ton | 0.002240 | $21,130.01 | $47.33 |
| 020317 | HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA RESISTENCIA NORMAL FY=4200 KG/CM2 No. 2 DIAMETRO 1/4" INCLUYE:SUMINISTRO, ACARREOS INTERNOS, HABILITADO,ARMADO Y COLOCACION, ALAMBRE RECOCIDO, COSTO POR MANO DE OBRA, SEPARADOR DE CONCRETO PARA CALZAR ACERO, EQUIPO Y HERRAMIENTA. | ton | 0.000750 | $23,246.04 | $17.43 |
| 020317 | HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA RESISTENCIA NORMAL FY=4200 KG/CM2 No. 2 DIAMETRO 1/4" INCLUYE:SUMINISTRO, ACARREOS INTERNOS, HABILITADO,ARMADO Y COLOCACION, ALAMBRE RECOCIDO, COSTO POR MANO DE OBRA, SEPARADOR DE CONCRETO PARA CALZAR ACERO, EQUIPO Y HERRAMIENTA. | ton | 0.000750 | $23,246.04 | $17.43 |
| 020317 | HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA RESISTENCIA NORMAL FY=4200 KG/CM2 No. 2 DIAMETRO 1/4" INCLUYE:SUMINISTRO, ACARREOS INTERNOS, HABILITADO,ARMADO Y COLOCACION, ALAMBRE RECOCIDO, COSTO POR MANO DE OBRA, SEPARADOR DE CONCRETO PARA CALZAR ACERO, EQUIPO Y HERRAMIENTA. | ton | 0.000750 | $23,246.04 | $17.43 |
| 020317 | HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA RESISTENCIA NORMAL FY=4200 KG/CM2 No. 2 DIAMETRO 1/4" INCLUYE:SUMINISTRO, ACARREOS INTERNOS, HABILITADO,ARMADO Y COLOCACION, ALAMBRE RECOCIDO, COSTO POR MANO DE OBRA, SEPARADOR DE CONCRETO PARA CALZAR ACERO, EQUIPO Y HERRAMIENTA. | ton | 0.000750 | $23,246.04 | $17.43 |
| 020317 | HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA RESISTENCIA NORMAL FY=4200 KG/CM2 No. 2 DIAMETRO 1/4" INCLUYE:SUMINISTRO, ACARREOS INTERNOS, HABILITADO,ARMADO Y COLOCACION, ALAMBRE RECOCIDO, COSTO POR MANO DE OBRA, SEPARADOR DE CONCRETO PARA CALZAR ACERO, EQUIPO Y HERRAMIENTA. | ton | 0.000750 | $23,246.04 | $17.43 |
| 020317 | HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA RESISTENCIA NORMAL FY=4200 KG/CM2 No. 2 DIAMETRO 1/4" INCLUYE:SUMINISTRO, ACARREOS INTERNOS, HABILITADO,ARMADO Y COLOCACION, ALAMBRE RECOCIDO, COSTO POR MANO DE OBRA, SEPARADOR DE CONCRETO PARA CALZAR ACERO, EQUIPO Y HERRAMIENTA. | ton | 0.000750 | $23,246.04 | $17.43 |
| 020473 | CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON CARRETILLA Y BOTES F'C=200 KG/CM2 REVENIMIENTO DE 10 CM AGREGADO MAXIMO 3/4" EN COLUMNAS Y MUROS. INCLUYE:SUMINISTRO DE MATERIALES, COSTO POR MANO DE OBRA, EQUIPO Y HERRAMIENTA. | m3 | 0.022500 | $1,695.11 | $38.14 |
| 020473 | CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON CARRETILLA Y BOTES F'C=200 KG/CM2 REVENIMIENTO DE 10 CM AGREGADO MAXIMO 3/4" EN COLUMNAS Y MUROS. INCLUYE:SUMINISTRO DE MATERIALES, COSTO POR MANO DE OBRA, EQUIPO Y HERRAMIENTA. | m3 | 0.022500 | $1,695.11 | $38.14 |
| 020473 | CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON CARRETILLA Y BOTES F'C=200 KG/CM2 REVENIMIENTO DE 10 CM AGREGADO MAXIMO 3/4" EN COLUMNAS Y MUROS. INCLUYE:SUMINISTRO DE MATERIALES, COSTO POR MANO DE OBRA, EQUIPO Y HERRAMIENTA. | m3 | 0.022500 | $1,695.11 | $38.14 |
| 020473 | CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON CARRETILLA Y BOTES F'C=200 KG/CM2 REVENIMIENTO DE 10 CM AGREGADO MAXIMO 3/4" EN COLUMNAS Y MUROS. INCLUYE:SUMINISTRO DE MATERIALES, COSTO POR MANO DE OBRA, EQUIPO Y HERRAMIENTA. | m3 | 0.022500 | $1,695.11 | $38.14 |
| 020473 | CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON CARRETILLA Y BOTES F'C=200 KG/CM2 REVENIMIENTO DE 10 CM AGREGADO MAXIMO 3/4" EN COLUMNAS Y MUROS. INCLUYE:SUMINISTRO DE MATERIALES, COSTO POR MANO DE OBRA, EQUIPO Y HERRAMIENTA. | m3 | 0.022500 | $1,695.11 | $38.14 |
| 020473 | CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON CARRETILLA Y BOTES F'C=200 KG/CM2 REVENIMIENTO DE 10 CM AGREGADO MAXIMO 3/4" EN COLUMNAS Y MUROS. INCLUYE:SUMINISTRO DE MATERIALES, COSTO POR MANO DE OBRA, EQUIPO Y HERRAMIENTA. | m3 | 0.022500 | $1,695.11 | $38.14 |
| Suma de Concepto | | | | $617.43 |
| Costo Directo | | | | $853.79 |