| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| EXT-ACAB-008 | SUMINISTRO Y COLOCACION DE LOSETA CERAMICA EN MESETAS DE OVALINES, MODELO AQUARELLE SKY BLUE, MCA. INTERCERAMIC DE 30X45 CMS. ASENTADA CON ADHESIVO BLANCO ANTIDESLIZAMIENTO MCA INTERCERAMIC, JUNTEADO CON BOQUILLA WHITE PEARL DE 2 MM. SIN ARENA.INCLUYE: RECORTES CURVOS PARA OVALINES, CUADROS DE VALVULAS, EN BOQUILLAS DE MUROS DIVISORIOS Y VENTANAS, A CUALQUIER ALTURA, INCLUYE: MATERIALES, MANO DE OBRA ESPECIALIZADA, HERRAMIENTA Y EQUIPO. | m2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| BOQUILLA | BOQUILLA SIN ARENA WHITE PEARL CAJA 5 KG (RDTO. 13 M2/CAJA) | caja | 0.076000 | $68.70 | $5.22 |
| BOQUILLA | BOQUILLA SIN ARENA WHITE PEARL CAJA 5 KG (RDTO. 13 M2/CAJA) | caja | 0.076000 | $68.70 | $5.22 |
| BOQUILLA | BOQUILLA SIN ARENA WHITE PEARL CAJA 5 KG (RDTO. 13 M2/CAJA) | caja | 0.076000 | $68.70 | $5.22 |
| SKY-BLU-001 | LOSETA CERAMICA MODELO AQUARELLE SKY BLUE, MCA. INTERCERAMIC DE 30X45 CMS. | m2 | 1.050000 | $138.26 | $145.17 |
| SKY-BLU-001 | LOSETA CERAMICA MODELO AQUARELLE SKY BLUE, MCA. INTERCERAMIC DE 30X45 CMS. | m2 | 1.050000 | $138.26 | $145.17 |
| SKY-BLU-001 | LOSETA CERAMICA MODELO AQUARELLE SKY BLUE, MCA. INTERCERAMIC DE 30X45 CMS. | m2 | 1.050000 | $138.26 | $145.17 |
| DISCO P/DESVASTE | DISCO P DESVASTE | pieza | 0.013200 | $29.69 | $0.39 |
| DISCO P/DESVASTE | DISCO P DESVASTE | pieza | 0.013200 | $29.69 | $0.39 |
| DISCO P/DESVASTE | DISCO P DESVASTE | pieza | 0.013200 | $29.69 | $0.39 |
| ADH-ANT-01 | ADHESIVO ANTIDESLIZAMIENTO BLANCO | kg | 4.750000 | $4.30 | $20.43 |
| ADH-ANT-01 | ADHESIVO ANTIDESLIZAMIENTO BLANCO | kg | 4.750000 | $4.30 | $20.43 |
| ADH-ANT-01 | ADHESIVO ANTIDESLIZAMIENTO BLANCO | kg | 4.750000 | $4.30 | $20.43 |
| Suma de Material | $513.63 | ||||
| Mano de Obra | |||||
| CUADRILLA -21 | ( 1 COLOCADOR + 1 AYUDANTE) | jor | 0.250000 | $959.29 | $239.82 |
| CUADRILLA -21 | ( 1 COLOCADOR + 1 AYUDANTE) | jor | 0.250000 | $959.29 | $239.82 |
| CUADRILLA -21 | ( 1 COLOCADOR + 1 AYUDANTE) | jor | 0.250000 | $959.29 | $239.82 |
| 02-0010 | CUADRILLA No 1 ( 1 PEON ) | jor | 0.026316 | $396.90 | $10.44 |
| 02-0010 | CUADRILLA No 1 ( 1 PEON ) | jor | 0.026316 | $396.90 | $10.44 |
| 02-0010 | CUADRILLA No 1 ( 1 PEON ) | jor | 0.026316 | $396.90 | $10.44 |
| Suma de Mano de Obra | $750.80 | ||||
| Equipo | |||||
| ESMERILADORA | ESMERILADORA | hora | 0.100000 | $5.59 | $0.56 |
| ESMERILADORA | ESMERILADORA | hora | 0.100000 | $5.59 | $0.56 |
| ESMERILADORA | ESMERILADORA | hora | 0.100000 | $5.59 | $0.56 |
| Suma de Equipo | $1.68 | ||||
| Auxiliar | |||||
| 00-0050 | AGUA ACARREADA EN PIPA; INCLUYE TRANSPORTE A OBRA Y PAGO DE REGALIAS. | m3 | 0.008000 | $69.04 | $0.55 |
| 00-0050 | AGUA ACARREADA EN PIPA; INCLUYE TRANSPORTE A OBRA Y PAGO DE REGALIAS. | m3 | 0.008000 | $69.04 | $0.55 |
| 00-0050 | AGUA ACARREADA EN PIPA; INCLUYE TRANSPORTE A OBRA Y PAGO DE REGALIAS. | m3 | 0.008000 | $69.04 | $0.55 |
| Suma de Auxiliar | $1.66 | ||||
| Costo Directo | $1,267.77 |