| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| C-13 | DALA DE REMATE DE CONCRETO 20X20CM F'C=200KG/CM2 ARMADA CON 4 VARILLAS DEL No. 4, ESTRIBOS DEL No. 2 @20CM INCLUYE: CIMBRA, ACERO Y CONCRETO | ML |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| 1900-05 | MADERA DE PINO DE 3A. EN DUELA DE 1" X 4" | PT | 1.200000 | $5.65 | $6.78 |
| 1900-10 | MADERA DE PINO DE 3A. EN BARROTE DE 2" X 4" | PT | 0.650000 | $5.65 | $3.67 |
| 1900-15 | MADERA DE PINO DE 3A. EN POLIN DE 4" X 4" | PT | 2.040000 | $9.30 | $18.97 |
| 0082-00 | ALAMBRE RECOCIDO NO. 16 | KG | 0.205000 | $14.50 | $2.97 |
| 0100-00 | CLAVO DE 2 1/2" A 3 1/2" | KG | 0.135000 | $17.00 | $2.30 |
| 0950-05 | DIESEL | LT | 0.600000 | $5.95 | $3.57 |
| SEGURIDAD IND. | SEGURIDAD INDUSTRIAL PARA PERSONAL | LOTE | 1.000000 | $2.00 | $2.00 |
| Suma de Material | $40.26 | ||||
| Mano de Obra | |||||
| 02-0410 | CUADRILLA No 41 ( 1 ALBAÑIL + 1 PEON ) | JOR | 0.094780 | $559.85 | $53.06 |
| Suma de Mano de Obra | $53.06 | ||||
| Auxiliar | |||||
| 03-7012 | ANDAMIO DE CABALLETES Y TABLONES CONSTRUIDO CON MADERA DE PINO DE 3¬ USADO PARA ALTURAS DE 1.50 A 3.00 M. | USO | 0.114200 | $20.08 | $2.29 |
| Suma de Auxiliar | $2.29 | ||||
| Concepto | |||||
| 020406 | CONCRETO HECHO EN OBRA RESISTENCIA RAPIDA VACIADO CON CARRETILLA Y BOTES F'C=200 KG/CM2 REVNIMIENTO DE 10 CM AGREGADO MAXIMO 3/4" EN CIMENTACION | M3 | 0.036000 | $1,055.99 | $38.02 |
| 020305 | HABILITADO Y ARMADO DE ACERO DE REFUERZO EN CIMENTACION RESISTENCIA NORMAL FY=4200 KG/CM2 No. 4 DIAMETRO 1/2" | TON | 0.004000 | $12,551.58 | $50.21 |
| 020301 | HABILITADO Y ARMADO DE ACERO DE REFUERZO RESISTENCIA NORMAL FY=4200 KG/CM2 No. 2 DIAMETRO 1/4" | TON | 0.001440 | $12,862.69 | $18.52 |
| Suma de Concepto | $106.74 | ||||
| Costo Directo | $202.36 |