| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 7.350 | INSTALACIÓN DE BASE PLATO DE TIERRA SOLDABLE. | PZA |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| TRAPO | TRAPO LIMPIO | KGS | 0.100000 | $22.50 | $2.25 |
| Suma de Material | $2.25 | ||||
| Mano de Obra | |||||
| CUAD-08 | CUADRILLA DE ELECTRICISTA | JOR | 0.166667 | $5,898.48 | $983.08 |
| Suma de Mano de Obra | $983.08 | ||||
| Herramienta | |||||
| MO02 | HERRAMIENTA MANUAL | (%)mo | 0.025000 | $0.00 | $0.00 |
| M001 | EQUIPOS DE SEGURIDAD | (%)mo | 0.025000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Equipo | |||||
| ESCALERA | ESCALERA DE TIJERA MARCA CUPRUM | HORA | 0.200000 | $0.39 | $0.08 |
| AME-01 | ANDAMIO METALICO TOTAL ATLAS SYSTEM CON ACCESORIOS | HORA | 0.200000 | $73.53 | $14.71 |
| TALA | TALADRO ELECTRICO MARCA DEWALL DE 1/2 DE DIAM | HORA | 0.200000 | $0.40 | $0.08 |
| Suma de Equipo | $14.86 | ||||
| Costo Directo | $1,000.20 |