| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| APL-PLA/61X61-MIL | FALSO PLAFOND DE 61 X 61 cm., A BASE DE RETÍCULA METÁLICA Y SUSPENSIÓN TIPO DONN-DX, LAMINA CONTRA HUMEDAD TIPO MILENIA, INCLUYE: MATERIALES, ACARREOS DE LOS MISMOS, MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| OC-PLAF-15 | Falso plafón de 61 x 61 | m2 | 1.030000 | $226.24 | $233.03 |
| OC-PLAF-15 | Falso plafón de 61 x 61 | m2 | 1.030000 | $226.24 | $233.03 |
| OC-ACER-REF2 | Alambre galvanizado calibre 12 | kg | 0.160000 | $19.82 | $3.17 |
| OC-ACER-REF2 | Alambre galvanizado calibre 12 | kg | 0.160000 | $19.82 | $3.17 |
| OC-PLAF-18 | Tee principal donn dx | m | 0.998100 | $11.40 | $11.38 |
| OC-PLAF-18 | Tee principal donn dx | m | 0.998100 | $11.40 | $11.38 |
| OC-PLAF-19 | Tee conectora donn dx (1.22 mts.) | m | 1.965600 | $20.24 | $39.78 |
| OC-PLAF-19 | Tee conectora donn dx (1.22 mts.) | m | 1.965600 | $20.24 | $39.78 |
| OC-PLAF-20 | Tee conectora donn dx (0.61 mts.) | m | 0.642600 | $10.76 | $6.91 |
| OC-PLAF-20 | Tee conectora donn dx (0.61 mts.) | m | 0.642600 | $10.76 | $6.91 |
| OC-PLAF-16 | Angulo perimetral | m | 0.653400 | $5.36 | $3.50 |
| OC-PLAF-16 | Angulo perimetral | m | 0.653400 | $5.36 | $3.50 |
| OC-PLAF-03 | Tornillos p/madera 10 x 2" | pza | 5.000000 | $0.63 | $3.15 |
| OC-PLAF-03 | Tornillos p/madera 10 x 2" | pza | 5.000000 | $0.63 | $3.15 |
| OC-PLAF-05 | Taquete de fibra de 12 x 2" | pza | 5.000000 | $0.36 | $1.80 |
| OC-PLAF-05 | Taquete de fibra de 12 x 2" | pza | 5.000000 | $0.36 | $1.80 |
| OC-PLAF-07 | Tornillo Hilty | pza | 2.100000 | $6.89 | $14.47 |
| OC-PLAF-07 | Tornillo Hilty | pza | 2.100000 | $6.89 | $14.47 |
| OC-PLAF-08 | Clip Hilty 13 x 3/4" | pza | 2.100000 | $8.69 | $18.25 |
| OC-PLAF-08 | Clip Hilty 13 x 3/4" | pza | 2.100000 | $8.69 | $18.25 |
| OC-ACE-EST11 | Solera estructural A-36 de 1/4" x 3" | kg | 2.400000 | $12.20 | $29.28 |
| OC-ACE-EST11 | Solera estructural A-36 de 1/4" x 3" | kg | 2.400000 | $12.20 | $29.28 |
| Suma de Material | $729.45 | ||||
| Mano de Obra | |||||
| OC-CUA2 | Cuadrilla (1 yesero + 1 ayudante) | jor | 0.125000 | $941.43 | $117.68 |
| OC-CUA2 | Cuadrilla (1 yesero + 1 ayudante) | jor | 0.125000 | $941.43 | $117.68 |
| Suma de Mano de Obra | $235.36 | ||||
| Auxiliar | |||||
| OC-AUX13 | Andamio tubular de 4 m, con ruedas, plataforma y barras, con tablones. | r/d | 0.800000 | $87.27 | $69.82 |
| OC-AUX13 | Andamio tubular de 4 m, con ruedas, plataforma y barras, con tablones. | r/d | 0.800000 | $87.27 | $69.82 |
| Suma de Auxiliar | $139.63 | ||||
| Costo Directo | $1,104.44 |