| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| PLA01 | PLANTILLA DE CONCRETO SIMPLE F'C=100 KG/CM2 DE 5 CM DE ESPESOR | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CONCRETO PRE-06 | CONCRETO PREMEZCLADO DE F'C= 100 KG/CM2. ELABORADO CON CEMENTO RESISTENTE A LOS SULFATOS Y ALCALISIS | M3 | 0.052500 | $715.00 | $37.54 |
| CONCRETO PRE-06 | CONCRETO PREMEZCLADO DE F'C= 100 KG/CM2. ELABORADO CON CEMENTO RESISTENTE A LOS SULFATOS Y ALCALISIS | M3 | 0.052500 | $715.00 | $37.54 |
| CONCRETO PRE-06 | CONCRETO PREMEZCLADO DE F'C= 100 KG/CM2. ELABORADO CON CEMENTO RESISTENTE A LOS SULFATOS Y ALCALISIS | M3 | 0.052500 | $715.00 | $37.54 |
| CIMBRA-04 | MADERA DE PINO | PT | 0.550000 | $7.50 | $4.13 |
| CIMBRA-04 | MADERA DE PINO | PT | 0.550000 | $7.50 | $4.13 |
| CIMBRA-04 | MADERA DE PINO | PT | 0.550000 | $7.50 | $4.13 |
| COMBUSTIBLE 01 | DIESEL | LT | 0.500000 | $5.15 | $2.58 |
| COMBUSTIBLE 01 | DIESEL | LT | 0.500000 | $5.15 | $2.58 |
| COMBUSTIBLE 01 | DIESEL | LT | 0.500000 | $5.15 | $2.58 |
| CIMBRA05 | CLAVO (VARIAS MED.) | Kg | 0.050000 | $16.25 | $0.81 |
| CIMBRA05 | CLAVO (VARIAS MED.) | Kg | 0.050000 | $16.25 | $0.81 |
| CIMBRA05 | CLAVO (VARIAS MED.) | Kg | 0.050000 | $16.25 | $0.81 |
| Suma de Material | $135.15 | ||||
| Mano de Obra | |||||
| CUAD OC 12 | (1 Of. Albanil + 1 Peón) | JOR | 0.041667 | $603.08 | $25.13 |
| CUAD OC 12 | (1 Of. Albanil + 1 Peón) | JOR | 0.041667 | $603.08 | $25.13 |
| CUAD OC 12 | (1 Of. Albanil + 1 Peón) | JOR | 0.041667 | $603.08 | $25.13 |
| Suma de Mano de Obra | $75.39 | ||||
| Costo Directo | $210.54 |