| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | | | | |
| CONCRETO PRE-05 | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2, ELABORADO CON CEMENTO RESISTENTE A LOS SULFATOS Y ALCALISIS | M3 | 1.050000 | $865.00 | $908.25 |
| CONCRETO PRE-05 | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2, ELABORADO CON CEMENTO RESISTENTE A LOS SULFATOS Y ALCALISIS | M3 | 1.050000 | $865.00 | $908.25 |
| CONCRETO PRE-05 | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2, ELABORADO CON CEMENTO RESISTENTE A LOS SULFATOS Y ALCALISIS | M3 | 1.050000 | $865.00 | $908.25 |
| CONCRETO PRE-05 | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2, ELABORADO CON CEMENTO RESISTENTE A LOS SULFATOS Y ALCALISIS | M3 | 1.050000 | $865.00 | $908.25 |
| CONCRETO PRE-05 | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2, ELABORADO CON CEMENTO RESISTENTE A LOS SULFATOS Y ALCALISIS | M3 | 1.050000 | $865.00 | $908.25 |
| CONCRETO PRE-05 | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2, ELABORADO CON CEMENTO RESISTENTE A LOS SULFATOS Y ALCALISIS | M3 | 1.050000 | $865.00 | $908.25 |
| CONCRETO PRE-05 | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2, ELABORADO CON CEMENTO RESISTENTE A LOS SULFATOS Y ALCALISIS | M3 | 1.050000 | $865.00 | $908.25 |
| CONCRETO PRE-05 | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2, ELABORADO CON CEMENTO RESISTENTE A LOS SULFATOS Y ALCALISIS | M3 | 1.050000 | $865.00 | $908.25 |
| CONCRETO PRE-05 | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2, ELABORADO CON CEMENTO RESISTENTE A LOS SULFATOS Y ALCALISIS | M3 | 1.050000 | $865.00 | $908.25 |
| CONCRETO PRE-05 | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2, ELABORADO CON CEMENTO RESISTENTE A LOS SULFATOS Y ALCALISIS | M3 | 1.050000 | $865.00 | $908.25 |
| AGUA | AGUA | M3 | 0.060000 | $2.00 | $0.12 |
| AGUA | AGUA | M3 | 0.060000 | $2.00 | $0.12 |
| AGUA | AGUA | M3 | 0.060000 | $2.00 | $0.12 |
| AGUA | AGUA | M3 | 0.060000 | $2.00 | $0.12 |
| AGUA | AGUA | M3 | 0.060000 | $2.00 | $0.12 |
| AGUA | AGUA | M3 | 0.060000 | $2.00 | $0.12 |
| PAVIMENTO-06 | MEMBRANA DE CURADO WRMEADOWS | LT | 0.500000 | $8.89 | $4.45 |
| PAVIMENTO-06 | MEMBRANA DE CURADO WRMEADOWS | LT | 0.500000 | $8.89 | $4.45 |
| COMBUSTIBLE 01 | DIESEL | LT | 1.100000 | $5.15 | $5.67 |
| COMBUSTIBLE 01 | DIESEL | LT | 1.100000 | $5.15 | $5.67 |
| PAVIMENTO-06 | MEMBRANA DE CURADO WRMEADOWS | LT | 0.150000 | $8.89 | $1.33 |
| PAVIMENTO-06 | MEMBRANA DE CURADO WRMEADOWS | LT | 0.150000 | $8.89 | $1.33 |
| PAVIMENTO-06 | MEMBRANA DE CURADO WRMEADOWS | LT | 0.150000 | $8.89 | $1.33 |
| PAVIMENTO-06 | MEMBRANA DE CURADO WRMEADOWS | LT | 0.150000 | $8.89 | $1.33 |
| PAVIMENTO-06 | MEMBRANA DE CURADO WRMEADOWS | LT | 0.150000 | $8.89 | $1.33 |
| PAVIMENTO-06 | MEMBRANA DE CURADO WRMEADOWS | LT | 0.150000 | $8.89 | $1.33 |
| CIMBRA-04 | MADERA DE PINO | PT | 7.000000 | $7.50 | $52.50 |
| CIMBRA-04 | MADERA DE PINO | PT | 7.000000 | $7.50 | $52.50 |
| ALAMBRE | ALAMBRE RECOCIDO | KG | 0.100000 | $15.00 | $1.50 |
| ALAMBRE | ALAMBRE RECOCIDO | KG | 0.100000 | $15.00 | $1.50 |
| REVENIMIENTO | REVENIMIENTO PARA BOMBEO | M3 | 1.050000 | $75.00 | $78.75 |
| REVENIMIENTO | REVENIMIENTO PARA BOMBEO | M3 | 1.050000 | $75.00 | $78.75 |
| REVENIMIENTO | REVENIMIENTO PARA BOMBEO | M3 | 1.050000 | $75.00 | $78.75 |
| REVENIMIENTO | REVENIMIENTO PARA BOMBEO | M3 | 1.050000 | $75.00 | $78.75 |
| CIMBRA-01 | CIMBRAPLAY | M2 | 0.650000 | $92.00 | $59.80 |
| CIMBRA-01 | CIMBRAPLAY | M2 | 0.650000 | $92.00 | $59.80 |
| CIMBRA-04 | MADERA DE PINO | PT | 1.250000 | $7.50 | $9.38 |
| CIMBRA-04 | MADERA DE PINO | PT | 1.250000 | $7.50 | $9.38 |
| CONCRETO PRE-02 | SERVICIO DE BOMBEO | M3 | 1.050000 | $130.00 | $136.50 |
| CONCRETO PRE-02 | SERVICIO DE BOMBEO | M3 | 1.050000 | $130.00 | $136.50 |
| CIMBRA-04 | MADERA DE PINO | PT | 2.500000 | $7.50 | $18.75 |
| CIMBRA-04 | MADERA DE PINO | PT | 2.500000 | $7.50 | $18.75 |
| CIMBRA05 | CLAVO (VARIAS MED.) | Kg | 0.020000 | $16.25 | $0.33 |
| CIMBRA05 | CLAVO (VARIAS MED.) | Kg | 0.020000 | $16.25 | $0.33 |
| CONCRETO PRE-02 | SERVICIO DE BOMBEO | M3 | 1.050000 | $130.00 | $136.50 |
| CONCRETO PRE-02 | SERVICIO DE BOMBEO | M3 | 1.050000 | $130.00 | $136.50 |
| CIMBRA-04 | MADERA DE PINO | PT | 5.250000 | $7.50 | $39.38 |
| CIMBRA-04 | MADERA DE PINO | PT | 5.250000 | $7.50 | $39.38 |
| CIMBRA05 | CLAVO (VARIAS MED.) | Kg | 0.020000 | $16.25 | $0.33 |
| CIMBRA05 | CLAVO (VARIAS MED.) | Kg | 0.020000 | $16.25 | $0.33 |
| CONCRETO PRE-02 | SERVICIO DE BOMBEO | M3 | 1.000000 | $130.00 | $130.00 |
| CONCRETO PRE-02 | SERVICIO DE BOMBEO | M3 | 1.000000 | $130.00 | $130.00 |
| REVENIMIENTO | REVENIMIENTO PARA BOMBEO | M3 | 1.050000 | $75.00 | $78.75 |
| REVENIMIENTO | REVENIMIENTO PARA BOMBEO | M3 | 1.050000 | $75.00 | $78.75 |
| CIMBRA-01 | CIMBRAPLAY | M2 | 1.100000 | $92.00 | $101.20 |
| CIMBRA-01 | CIMBRAPLAY | M2 | 1.100000 | $92.00 | $101.20 |
| CONCRETO PRE-02 | SERVICIO DE BOMBEO | M3 | 1.050000 | $130.00 | $136.50 |
| CONCRETO PRE-02 | SERVICIO DE BOMBEO | M3 | 1.050000 | $130.00 | $136.50 |
| CIMBRA-01 | CIMBRAPLAY | M2 | 0.100000 | $92.00 | $9.20 |
| CIMBRA-01 | CIMBRAPLAY | M2 | 0.100000 | $92.00 | $9.20 |
| CIMBRA05 | CLAVO (VARIAS MED.) | Kg | 0.020000 | $16.25 | $0.33 |
| CIMBRA05 | CLAVO (VARIAS MED.) | Kg | 0.020000 | $16.25 | $0.33 |
| CIMBRA05 | CLAVO (VARIAS MED.) | Kg | 0.100000 | $16.25 | $1.63 |
| CIMBRA05 | CLAVO (VARIAS MED.) | Kg | 0.100000 | $16.25 | $1.63 |
| Suma de Material | | | | $11,251.54 |
| Mano de Obra | | | | |
| CUADRILLA NO. 10 | (1 Of. Albanil + 5 Peones). | JOR | 0.067500 | $1,648.50 | $111.27 |
| CUADRILLA NO. 10 | (1 Of. Albanil + 5 Peones). | JOR | 0.067500 | $1,648.50 | $111.27 |
| CUADRILLA CARO. ON | (1 Of. Carpintero O.N. + 1Ayte). | JOR | 0.166700 | $674.87 | $112.50 |
| CUADRILLA CARO. ON | (1 Of. Carpintero O.N. + 1Ayte). | JOR | 0.166700 | $674.87 | $112.50 |
| CUAD OC 12 | (1 Of. Albanil + 1 Peón) | JOR | 0.120000 | $603.08 | $72.37 |
| CUAD OC 12 | (1 Of. Albanil + 1 Peón) | JOR | 0.120000 | $603.08 | $72.37 |
| CUAD OC 12 | (1 Of. Albanil + 1 Peón) | JOR | 0.124362 | $603.08 | $75.00 |
| CUAD OC 12 | (1 Of. Albanil + 1 Peón) | JOR | 0.124362 | $603.08 | $75.00 |
| CUADRILLA CARO. ON | (1 Of. Carpintero O.N. + 1Ayte). | JOR | 0.083333 | $674.87 | $56.24 |
| CUADRILLA CARO. ON | (1 Of. Carpintero O.N. + 1Ayte). | JOR | 0.083333 | $674.87 | $56.24 |
| CUAD OC 12 | (1 Of. Albanil + 1 Peón) | JOR | 0.124362 | $603.08 | $75.00 |
| CUAD OC 12 | (1 Of. Albanil + 1 Peón) | JOR | 0.124362 | $603.08 | $75.00 |
| CUADRILLA CARO. ON | (1 Of. Carpintero O.N. + 1Ayte). | JOR | 0.083333 | $674.87 | $56.24 |
| CUADRILLA CARO. ON | (1 Of. Carpintero O.N. + 1Ayte). | JOR | 0.083333 | $674.87 | $56.24 |
| CUAD OC 12 | (1 Of. Albanil + 1 Peón) | JOR | 0.124362 | $603.08 | $75.00 |
| CUAD OC 12 | (1 Of. Albanil + 1 Peón) | JOR | 0.124362 | $603.08 | $75.00 |
| CUADRILLA CARO. ON | (1 Of. Carpintero O.N. + 1Ayte). | JOR | 0.010000 | $674.87 | $6.75 |
| CUADRILLA CARO. ON | (1 Of. Carpintero O.N. + 1Ayte). | JOR | 0.010000 | $674.87 | $6.75 |
| Suma de Mano de Obra | | | | $1,280.74 |
| Equipo | | | | |
| AMAQUINARIA-23 | VIBRADOR PARA CONCRETO MCA CIPSA CON MOTOR KOHLER 4 H.P. CONJUNTO CABEZAL DE 14" | HR | 0.182229 | $45.31 | $8.26 |
| AMAQUINARIA-23 | VIBRADOR PARA CONCRETO MCA CIPSA CON MOTOR KOHLER 4 H.P. CONJUNTO CABEZAL DE 14" | HR | 0.182229 | $45.31 | $8.26 |
| AMAQUINARIA-23 | VIBRADOR PARA CONCRETO MCA CIPSA CON MOTOR KOHLER 4 H.P. CONJUNTO CABEZAL DE 14" | HR | 0.182230 | $45.31 | $8.26 |
| AMAQUINARIA-23 | VIBRADOR PARA CONCRETO MCA CIPSA CON MOTOR KOHLER 4 H.P. CONJUNTO CABEZAL DE 14" | HR | 0.182230 | $45.31 | $8.26 |
| AMAQUINARIA-23 | VIBRADOR PARA CONCRETO MCA CIPSA CON MOTOR KOHLER 4 H.P. CONJUNTO CABEZAL DE 14" | HR | 0.137856 | $45.31 | $6.25 |
| AMAQUINARIA-23 | VIBRADOR PARA CONCRETO MCA CIPSA CON MOTOR KOHLER 4 H.P. CONJUNTO CABEZAL DE 14" | HR | 0.137856 | $45.31 | $6.25 |
| AMAQUINARIA-23 | VIBRADOR PARA CONCRETO MCA CIPSA CON MOTOR KOHLER 4 H.P. CONJUNTO CABEZAL DE 14" | HR | 0.182229 | $45.31 | $8.26 |
| AMAQUINARIA-23 | VIBRADOR PARA CONCRETO MCA CIPSA CON MOTOR KOHLER 4 H.P. CONJUNTO CABEZAL DE 14" | HR | 0.182229 | $45.31 | $8.26 |
| Suma de Equipo | | | | $62.03 |
| Auxiliar | | | | |
| CIMBRA METALICA COLU | CIMBRA METALICA EN COLUMNAS Y OTROS ELEMENTOS | PZA | 0.004000 | $27,616.15 | $110.46 |
| CIMBRA METALICA COLU | CIMBRA METALICA EN COLUMNAS Y OTROS ELEMENTOS | PZA | 0.004000 | $27,616.15 | $110.46 |
| ANDAMIO | ANDAMIO RENTA POR DIA | DIA | 0.250000 | $60.45 | $15.11 |
| ANDAMIO | ANDAMIO RENTA POR DIA | DIA | 0.250000 | $60.45 | $15.11 |
| ANDAMIO | ANDAMIO RENTA POR DIA | DIA | 0.250000 | $60.45 | $15.11 |
| ANDAMIO | ANDAMIO RENTA POR DIA | DIA | 0.250000 | $60.45 | $15.11 |
| CIMBRA METALICA COLU | CIMBRA METALICA EN COLUMNAS Y OTROS ELEMENTOS | PZA | 0.005500 | $27,616.15 | $151.89 |
| CIMBRA METALICA COLU | CIMBRA METALICA EN COLUMNAS Y OTROS ELEMENTOS | PZA | 0.005500 | $27,616.15 | $151.89 |
| ANDAMIO | ANDAMIO RENTA POR DIA | DIA | 0.150000 | $60.45 | $9.07 |
| ANDAMIO | ANDAMIO RENTA POR DIA | DIA | 0.150000 | $60.45 | $9.07 |
| Suma de Auxiliar | | | | $603.29 |
| Costo Directo | | | | $13,197.61 |