| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 4030 02 | FABRICACION Y COLADO DE CONCRETO VIBRADO Y CURADO DE F'C= 200 KG/CM2. PARA BANQUETAS DE CONCRETO INCLUYE MALLA 6-6/10-10 COMO REFUERZO DE 10 CMS DE ESPESOR | M3. |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CONCRETO PREME-02 | CONCRETO PREMEZCLADO DE F'C =200 KG/CM2 | M3 | 1.080000 | $1,078.80 | $1,165.10 |
| CONCRETO PREME-02 | CONCRETO PREMEZCLADO DE F'C =200 KG/CM2 | M3 | 1.080000 | $1,078.80 | $1,165.10 |
| CONCRETO PREME-02 | CONCRETO PREMEZCLADO DE F'C =200 KG/CM2 | M3 | 1.080000 | $1,078.80 | $1,165.10 |
| CIMBRA 04 | MADERA PINO 3a. | PT | 9.500000 | $8.00 | $76.00 |
| CIMBRA 04 | MADERA PINO 3a. | PT | 9.500000 | $8.00 | $76.00 |
| CIMBRA 04 | MADERA PINO 3a. | PT | 9.500000 | $8.00 | $76.00 |
| CIMBRA-03 | DESMOLDANTE SEPAROL DE SIKA | LT | 2.000000 | $10.00 | $20.00 |
| CIMBRA-03 | DESMOLDANTE SEPAROL DE SIKA | LT | 2.000000 | $10.00 | $20.00 |
| CIMBRA-03 | DESMOLDANTE SEPAROL DE SIKA | LT | 2.000000 | $10.00 | $20.00 |
| ACERO 07 | MALLA 6X6-10/10 | M2 | 1.050000 | $15.74 | $16.53 |
| ACERO 07 | MALLA 6X6-10/10 | M2 | 1.050000 | $15.74 | $16.53 |
| ACERO 07 | MALLA 6X6-10/10 | M2 | 1.050000 | $15.74 | $16.53 |
| ACERO 01 | ALAMBRE RECOCIDO | KG | 0.005000 | $14.87 | $0.07 |
| ACERO 01 | ALAMBRE RECOCIDO | KG | 0.005000 | $14.87 | $0.07 |
| ACERO 01 | ALAMBRE RECOCIDO | KG | 0.005000 | $14.87 | $0.07 |
| Suma de Material | $3,833.12 | ||||
| Mano de Obra | |||||
| CUADRILLA NO. 10 | (1 Of. Albanil + 5 Peones). | JOR | 0.150000 | $1,738.06 | $260.71 |
| CUADRILLA NO. 10 | (1 Of. Albanil + 5 Peones). | JOR | 0.150000 | $1,738.06 | $260.71 |
| CUADRILLA NO. 10 | (1 Of. Albanil + 5 Peones). | JOR | 0.150000 | $1,738.06 | $260.71 |
| CUADRILLA NO. 16 | (1 Of. Fierrero + 1Ayudante). | Jor | 0.007000 | $697.90 | $4.89 |
| CUADRILLA NO. 16 | (1 Of. Fierrero + 1Ayudante). | Jor | 0.007000 | $697.90 | $4.89 |
| CUADRILLA NO. 16 | (1 Of. Fierrero + 1Ayudante). | Jor | 0.007000 | $697.90 | $4.89 |
| Suma de Mano de Obra | $796.78 | ||||
| Equipo | |||||
| MAQUINARIA-23 | VIBRADOR CONCRETO | HR | 0.200000 | $18.49 | $3.70 |
| MAQUINARIA-23 | VIBRADOR CONCRETO | HR | 0.200000 | $18.49 | $3.70 |
| MAQUINARIA-23 | VIBRADOR CONCRETO | HR | 0.200000 | $18.49 | $3.70 |
| Suma de Equipo | $11.09 | ||||
| Costo Directo | $4,640.99 |