| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 10000 AM | BARANDALES METALICOS FABRICADOS CON TUBO CEDULA 40 DE 1 1/2" , CON POSTES A CADA DOS METROS COMO MAXIMO,CON TUBO INTERMEDIO A 50 CMS, FIJADO A LAS VIGAS DEL PUENTE CON PLACAS DE 10 CMS X 10 CMS DE 1/4" DE ESPESOR ACERO AL CARBON, INCLUYE CORTES, BISELES, SOLDADURAS, TORNILLERÍA, EMPAQUES, ELMENTOS DE FIJACIÓN, ANCLAJE Y SOPORTE ASÍ COMO RECUBRIMIENTO EPOXICO A BASE DE LIMPIEZA A CHORRO DE ARENA A METAL BLANCO, DOS MANOS DE PRIMARIO EPOXICO INORGÁNICO DE ZINC (RP-4) Y DOS MANOS DE ACABADO EPOXICO DE ALTOS SÓLIDOS (RA-26) CON ESPESOR MÍNIMO DE PELICULA SECA DE 4 MILESIMAS DE PULGADA POR CADA MANO. | m |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| MTT1.5N | TUBO DE 1 1/2" DE DIÁMETRO C-40 | ML | 2.750000 | $46.25 | $127.19 |
| MTT1.5N | TUBO DE 1 1/2" DE DIÁMETRO C-40 | ML | 2.750000 | $46.25 | $127.19 |
| MTPL36 | PLACA DE ACERO A-36 | KG. | 1.200000 | $9.10 | $10.92 |
| MTPL36 | PLACA DE ACERO A-36 | KG. | 1.200000 | $9.10 | $10.92 |
| MTSOL1 | SOLDADURA E-6010/7018 | KG. | 0.100000 | $32.60 | $3.26 |
| MTSOL1 | SOLDADURA E-6010/7018 | KG. | 0.100000 | $32.60 | $3.26 |
| MTBAH1 | BARRENANCLA | PZA. | 2.000000 | $28.60 | $57.20 |
| MTBAH1 | BARRENANCLA | PZA. | 2.000000 | $28.60 | $57.20 |
| MTRP4 | RECUBRIMENTO RP-4B | LT | 0.080000 | $265.00 | $21.20 |
| MTRP4 | RECUBRIMENTO RP-4B | LT | 0.080000 | $265.00 | $21.20 |
| MTRA26 | RECUBRIMIENTO ACABADO RA-26 | LT | 0.100000 | $182.60 | $18.26 |
| MTRA26 | RECUBRIMIENTO ACABADO RA-26 | LT | 0.100000 | $182.60 | $18.26 |
| Suma de Material | $476.06 | ||||
| Mano de Obra | |||||
| CUADRILLA -38 | ( 1 OF. PAILERO + 1 AYUDANTE.) | JOR | 0.138813 | $748.28 | $103.87 |
| CUADRILLA -38 | ( 1 OF. PAILERO + 1 AYUDANTE.) | JOR | 0.138813 | $748.28 | $103.87 |
| Suma de Mano de Obra | $207.74 | ||||
| Equipo | |||||
| EQSOL1 | SOLDADORA MOTOR A COMB. INTERNA; 300A | HR | 0.200000 | $70.44 | $14.09 |
| EQSOL1 | SOLDADORA MOTOR A COMB. INTERNA; 300A | HR | 0.200000 | $70.44 | $14.09 |
| Suma de Equipo | $28.18 | ||||
| Concepto | |||||
| BASB1 | SANDBLASTEO | HR. | 0.200000 | $239.88 | $47.98 |
| BASB1 | SANDBLASTEO | HR. | 0.200000 | $239.88 | $47.98 |
| BAREC1 | APLICACION RECUBRIMIENTOS ANTICORROSIVOS | HR. | 0.200000 | $100.97 | $20.19 |
| BAREC1 | APLICACION RECUBRIMIENTOS ANTICORROSIVOS | HR. | 0.200000 | $100.97 | $20.19 |
| Suma de Concepto | $136.34 | ||||
| Costo Directo | $848.31 |