| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 4140 01 | IMPERMEABILIZACION A BASE DE TAPETE PREFABRICADO TIPO VITROPLAY DE 3.5 MM DE ESPESOR, ACABADO TERRACOTA. INCLUYE LEVANTAMIENTO DE IMPERMEABILIZANTE ANTERIOR, LIMPIEZA, PREPARACION DE LA SUPERFICIE CON UNA CAPA DE HIDROPRIMER Y RETIRO DEL MATERIAL DE DESPERDICIO FUERA DE LA OBRA. | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| PROTECTO HIDROPRIMER | PROTECTO HIDROPRIMER | LT | 0.200000 | $15.00 | $3.00 |
| PROTECTO HIDROPRIMER | PROTECTO HIDROPRIMER | LT | 0.200000 | $15.00 | $3.00 |
| PROTECTO HIDROPRIMER | PROTECTO HIDROPRIMER | LT | 0.200000 | $15.00 | $3.00 |
| PROTECTO HIDROPRIMER | PROTECTO HIDROPRIMER | LT | 0.200000 | $15.00 | $3.00 |
| PROTECTO HIDROPRIMER | PROTECTO HIDROPRIMER | LT | 0.200000 | $15.00 | $3.00 |
| PROTECTO HIDROPRIMER | PROTECTO HIDROPRIMER | LT | 0.200000 | $15.00 | $3.00 |
| COVER PLAY 3.5 MM | IMPERMEABILIZANTE TIPO APP DE 3.5 MM DE ESPESOR PREFABRICADO | M2 | 1.111110 | $30.00 | $33.33 |
| COVER PLAY 3.5 MM | IMPERMEABILIZANTE TIPO APP DE 3.5 MM DE ESPESOR PREFABRICADO | M2 | 1.111110 | $30.00 | $33.33 |
| COVER PLAY 3.5 MM | IMPERMEABILIZANTE TIPO APP DE 3.5 MM DE ESPESOR PREFABRICADO | M2 | 1.111110 | $30.00 | $33.33 |
| COVER PLAY 3.5 MM | IMPERMEABILIZANTE TIPO APP DE 3.5 MM DE ESPESOR PREFABRICADO | M2 | 1.111110 | $30.00 | $33.33 |
| COVER PLAY 3.5 MM | IMPERMEABILIZANTE TIPO APP DE 3.5 MM DE ESPESOR PREFABRICADO | M2 | 1.111110 | $30.00 | $33.33 |
| COVER PLAY 3.5 MM | IMPERMEABILIZANTE TIPO APP DE 3.5 MM DE ESPESOR PREFABRICADO | M2 | 1.111110 | $30.00 | $33.33 |
| PROTECTO BLANC | PROTECTO BLANC | LT | 0.285710 | $45.00 | $12.86 |
| PROTECTO BLANC | PROTECTO BLANC | LT | 0.285710 | $45.00 | $12.86 |
| PROTECTO BLANC | PROTECTO BLANC | LT | 0.285710 | $45.00 | $12.86 |
| PROTECTO BLANC | PROTECTO BLANC | LT | 0.285710 | $45.00 | $12.86 |
| PROTECTO BLANC | PROTECTO BLANC | LT | 0.285710 | $45.00 | $12.86 |
| PROTECTO BLANC | PROTECTO BLANC | LT | 0.285710 | $45.00 | $12.86 |
| Suma de Material | $295.14 | ||||
| Mano de Obra | |||||
| CUADRILLA NO. 02 | CUADRILLA NO. 2 ( 1 ALBAÑIL + 1 PEON) | JOR | 0.150000 | $749.36 | $112.40 |
| CUADRILLA NO. 02 | CUADRILLA NO. 2 ( 1 ALBAÑIL + 1 PEON) | JOR | 0.150000 | $749.36 | $112.40 |
| CUADRILLA NO. 02 | CUADRILLA NO. 2 ( 1 ALBAÑIL + 1 PEON) | JOR | 0.150000 | $749.36 | $112.40 |
| CUADRILLA NO. 02 | CUADRILLA NO. 2 ( 1 ALBAÑIL + 1 PEON) | JOR | 0.150000 | $749.36 | $112.40 |
| CUADRILLA NO. 02 | CUADRILLA NO. 2 ( 1 ALBAÑIL + 1 PEON) | JOR | 0.150000 | $749.36 | $112.40 |
| CUADRILLA NO. 02 | CUADRILLA NO. 2 ( 1 ALBAÑIL + 1 PEON) | JOR | 0.150000 | $749.36 | $112.40 |
| Suma de Mano de Obra | $674.42 | ||||
| Costo Directo | $969.57 |