| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| DETLL-CON | DETALLE DE CUBO DE CONCRETO PARA SOPORTE MULTIPLE, ELABORADA CON CONCRETO F'C=200 KG/CM2 SECCION DE 30X40X22.5 CMS. REFORZADA CON VR's DEL No. 3@15 CMS. EN AMBOS SENTIDOS, INCLUYE: ANCLAJES A LOSA DEL CARCAMO, CIMBRA, DESCIMBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION P.U.O.T. | PZA |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CIMBRA-04 | MADERA DE PINO | PT | 3.600000 | $5.62 | $20.23 |
| CIMBRA-01 | CIMBRAPLAY | M2 | 0.200000 | $77.26 | $15.45 |
| CIMBRA-02 | CLAVO | Kg. | 0.020000 | $14.00 | $0.28 |
| ACERO-01 | ACERO DEL # 3 ( 1/2") AL # 6 (3/4) | KG | 3.000000 | $7.40 | $22.20 |
| ACERO-02 | ALAMBRE RECOCIDO | KG | 0.030000 | $11.00 | $0.33 |
| Suma de Material | $58.49 | ||||
| Mano de Obra | |||||
| CUADRILLA NO. 11 | (1 Of. Carpintero O.N. + 1Ayte). | JOR | 0.200000 | $504.05 | $100.81 |
| CUADRILLA NO. 16 | (1 Of. Fierrero + 1Ayudante). | JOR | 0.007692 | $534.98 | $4.12 |
| CUADRILLA NO. 10 | (1 Of. Albanil + 5 Peones). | JOR | 0.125000 | $1,384.51 | $173.06 |
| Suma de Mano de Obra | $277.99 | ||||
| Equipo | |||||
| MAQUINARIA-23 | VIBRADOR PARA CONCRETO CIPSA KOHLER 8 HP BASE TIPO JAULA | HR | 1.000000 | $7.09 | $7.09 |
| Suma de Equipo | $7.09 | ||||
| Auxiliar | |||||
| CONCRETO-F-C=200 H/O | CONCRETO DE F'C=200 KG/CM2 HECHO EN OBRA RESISTENCIA NORMAL AGREGADO MAXIMO 3/4" | M3 | 0.400000 | $881.18 | $352.47 |
| Suma de Auxiliar | $352.47 | ||||
| Costo Directo | $696.04 |