| Clave | Descripci贸n del An谩lisis de Precio Unitario | Unidad |
| ELEQ02-C | CENTRO DE CARGA SQUARE D 220V, 1 F, 2 H DE 1X50 AMS. INCLUYE: SUMINISTRO, COLOCACION DE INTERRUPTOR TERMOMAGNETICO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCI脫N P.U.OT. | PZA. |
| Clave | Descripci贸n | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| C.C. SQD C/I.P. 1X50 | CENTRO DE CARGA SQUARE D 220V, 1 F, 2 H DE 1X50 AMS. | PZA | 1.000000 | $1,278.00 | $1,278.00 |
| TAQUETE DE PLAST 1/4 | TAQUETE DE PLAST 1/4 | PZA | 4.000000 | $0.39 | $1.56 |
| PIJA NO.8 1 1/4 X 1 | PIJA NO.8 1 1/4 X 1 | PZA | 4.000000 | $0.29 | $1.16 |
| BROCA 3/8 CONCRETO | BROCA CONCRETO Y FIERRO 3/8" | PZA | 0.066667 | $72.75 | $4.85 |
| Suma de Material | $1,285.57 | ||||
| Mano de Obra | |||||
| CUADRILLA BAJA TENSI | Cuadrilla No. 32 (1Of. Electricista,1 Ayudantes) | JOR | 1.500000 | $707.65 | $1,061.48 |
| Suma de Mano de Obra | $1,061.48 | ||||
| Costo Directo | $2,347.05 |