| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| RIEGO-002 | RIEGO DE LIGA CON EMULSION CATIONICA DE ROMPIMIENTO RAPIDO (E.C.R.R.) A RAZON DE 0.5 LTS/M2 | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| PAV-013 | EMULSION CATIONICA DE ROMPIMIENTO RAPIDO (E.C.R.R.) A RAZON DE 0.5 L/M2 | LTO | 0.500000 | $2.20 | $1.10 |
| PAV-005 | ALMACENAMIENTO DE PRODUCTOS ASFALTICOS | LTO | 0.500000 | $0.05 | $0.03 |
| PAV-006 | CALENTAMIENTO Y BOMBEO DE PRODUCTOS ASFALTICOS | LTO | 0.500000 | $0.03 | $0.02 |
| PAV-007 | MERMAS Y DESPERDICIOS DE PRODUCTOS ASFALTICOS | LTO | 0.500000 | $0.02 | $0.01 |
| PAV-008 | FLETE DE EMULSION ASFALTICA | LTO | 0.500000 | $0.06 | $0.03 |
| Suma de Material | $1.18 | ||||
| Equipo | |||||
| EQUI-001 | PETROLIZADORA SEAMAN GUNNISON DE 6,000 LTS DE 155 HP BOMBA 756 LPM CON BARRA DE 3.66 | hora | 0.000700 | $262.42 | $0.18 |
| Suma de Equipo | $0.18 | ||||
| Auxiliar | |||||
| AUXPAV-008 | BARRIDO DE LA SUPERFICIE A TRATAR | M2 | 1.000000 | $0.32 | $0.32 |
| Suma de Auxiliar | $0.32 | ||||
| Costo Directo | $1.68 |