| Clave | Descripci贸n del An谩lisis de Precio Unitario | Unidad |
| 245. | SUMINISTRO Y VACIADO DE CONCRETO PREMEZCLADO EN ESTRUCTURAS, f鈥檆 = 250 kg/cm2 HASTA 3.0 M. DE PROFUNDIDAD Y HASTA 5 M. DE ALTURA, TAMA脩O M脕XIMO DE AGREGADO 19 MM. DE ACUERDO A LOS PLANOS 879-057-D-F-004, F-013, F-001, F-002, F-016 Y ANEXO BP. | M3 |
| Clave | Descripci贸n | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| ALB006 | CEMENTO P脫RTLAND ORDINARIO TIPO CPO 30 RS EN SACO DE 50 KG MARCA APASCO | TON | 0.408000 | $1,994.37 | $813.70 |
| ALB003 | ARENA DE LA REGION | M3 | 0.506000 | $220.00 | $111.32 |
| ALB004 | GRAVA BLANCA LIGERA LIBRE DE IMPUREZAS DE 3/4" DE DIAMETRO. | M3 | 0.588000 | $240.00 | $141.12 |
| ALB002 | AGUA PUESTA EN SITIO | M3 | 0.212400 | $18.21 | $3.87 |
| Suma de Material | $1,070.01 | ||||
| Mano de Obra | |||||
| CUA08 | CUADRILLA 1 ALBA脩IL + 5 AYUDANTES | JOR | 0.066667 | $2,536.21 | $169.08 |
| Suma de Mano de Obra | $169.08 | ||||
| Herramienta | |||||
| %MO01 | HERRAMIENTA MENOR | (%)MO | 0.025000 | $0.00 | $0.00 |
| %MO02 | EQUIPO DE SEGURIDAD | (%)MO | 0.025000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Equipo | |||||
| EAL50 | CAMI脫N REVOLVEDORA CON TROMPO DE 7 M3 DE CAPACIDAD MARCA DINA, INCLUYE BOMBA PARA VACIADO | HR | 0.533333 | $332.84 | $177.51 |
| EAL02 | VIBRADOR PARA CONCRETO MARCA DYNAPAC-KOHLER MODELO K-91 DE 4 H.P. LONGITUD 14 PIES | HR | 0.533333 | $67.85 | $36.19 |
| EQ-EV024 | ELEMENTOS PARA ANDAMIOS MULTIFUNCIONALES DE ALUMINIO MARCA ATLAS | HORA | 0.533333 | $19.34 | $10.31 |
| EMP11 | CAMION CAPACIDAD DE 4 TON., MARCA DODGE, RAM-4000, MODELO 2006. | HR | 0.002000 | $222.17 | $0.44 |
| Suma de Equipo | $224.46 | ||||
| Auxiliar | |||||
| CURF01 | SUMINISTRO Y APLICACION DE CURADO CURAFEST | M2 | 1.000000 | $38.31 | $38.31 |
| PBA96 | SUMINISTRO DE PERSONAL Y EQUIPO PARA PRUEBA DE REVENIMIENTO Y RESISTENCIA A LA COMPRESION A CONCRETO | JOR | 0.020000 | $3,882.56 | $77.65 |
| Suma de Auxiliar | $115.96 | ||||
| Costo Directo | $1,579.51 |