| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| PRE-02 | TRAZO Y NIVELACION DE TERRENO PARA DESPLANTE DE ESTRUCTURA DE 400 A 1200 M2 | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| M-1900-10 | MADERA DE PINO DE 3A. EN BARROTE DE 2" X 4" | PT | 0.009000 | $13.91 | $0.13 |
| M-0300-60 | CALHIDRA EN SACO | TON | 0.000100 | $1,506.96 | $0.15 |
| M-1501-45 | CARRETE DE HILO DE PLASTICO PARA TRAZO CALIBRE 10 | ROL | 0.002000 | $18.59 | $0.04 |
| Suma de Material | $0.31 | ||||
| Mano de Obra | |||||
| CUA-092 | cuadrilla no. 92 | jor | 0.001800 | $813.82 | $1.46 |
| Suma de Mano de Obra | $1.46 | ||||
| Herramienta | |||||
| FAHM | FACTOR DE HERRAMINETA MENOR | (%)mo | 0.050000 | $0.00 | $0.00 |
| FAES | FACTOR DE EQUIPO DE SEGURIDAD | (%)mo | 0.100000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Equipo | |||||
| EQ-4280 | NIVEL | hora | 0.014500 | $6.06 | $0.09 |
| EQ-4290 | TRANSITO | hora | 0.014500 | $6.88 | $0.10 |
| Suma de Equipo | $0.19 | ||||
| Costo Directo | $1.97 |