| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 1241-05 | INTERCONEXION A 220V AL CENTRO DE CARGA INCLUYE TUBERIA CONDUIT DE PARED GRUESA DE 1" DE DIAMETRO Y CABLE DE CAL # 10, HERRAMIENTA, EQUIPO, MATERIAL Y MANO DE OBRA NECESARIA | PZA |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| TUBO COND 1" 1 | TUBO CONDUIT 1" GALVANIZADO P/GRUESA | M | 35.000000 | $79.20 | $2,772.00 |
| TUBO COND 2" 1 | TUBO CONDUIT 2" GALVANIZADA P/GRUESA | M | 35.000000 | $212.32 | $7,431.20 |
| CAJA CHAL 4" 1 | CAJA CHALUPA 4" | PZA | 1.000000 | $8.80 | $8.80 |
| CABLE # 8 1 | CABLE THWN CAL # 8 | M | 35.000000 | $16.80 | $588.00 |
| CABLE # 10 1 | CABLE THWN CAL # 10 | M | 35.000000 | $8.00 | $280.00 |
| Suma de Material | $11,080.00 | ||||
| Mano de Obra | |||||
| CABO DE OFICIOS 1 | CABO DE OFICIOS | JOR | 0.175000 | $290.45 | $50.83 |
| OPERARIO PRIMERA 1 | OPERARIO PRIMERA | JOR | 1.750000 | $233.90 | $409.33 |
| AYUDANTE OPERARIO 1 | AYUDANTE OPERARIO | JOR | 1.750000 | $181.41 | $317.47 |
| Suma de Mano de Obra | $777.62 | ||||
| Herramienta | |||||
| HERRAMIENTA MENOR 1 | HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Costo Directo | $11,857.62 |