| Clave | Descripci贸n del An谩lisis de Precio Unitario | Unidad |
| 270.3.007 | GUARNICION DE CONCRETO F'C=200 KG/CM2 DE 15 X 15 CMS DE BASE DE CUARTOS REFRIGERADORES Y CONGELADORES ARMADO CON 1 VAR No. 6 X 15 CMS @ 60 CMS | ML |
| Clave | Descripci贸n | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| ACE#3 | ACERO DE REFUERZO DE 3/8" #3 f`y = 4200 kg/ml | KG | 0.612700 | $7.00 | $4.29 |
| ALAMBRE RECOCIDO | ALAMBRE RECOCIDO | Kg | 0.017500 | $14.00 | $0.25 |
| POLIETILENOCAL 600 | POLIETILENO EN ROLLO | M2 | 0.300000 | $9.42 | $2.83 |
| Suma de Material | $7.36 | ||||
| Mano de Obra | |||||
| CUAD OC 09 | CUAD. 1 OF. ALBA脩IL + 1 PEON | jor | 0.080000 | $592.82 | $47.43 |
| Suma de Mano de Obra | $47.43 | ||||
| Auxiliar | |||||
| CONCRETO F-C=200 H/O | CONCRETO H.O. F'C=200 KG/CM2, R.N. AGR. MAX. 3/4" | M3 | 0.023600 | $793.01 | $18.72 |
| BAS-CIM | CIMBRA DE MADERA DE PINO DE 3a. ACABADO COMUN EN ESTRUCTURA, INCLUYE: MATERIALES, ACARREOS, DESPERDICIOS, HABILITADO, OBRA FALSA, CIMBRADO, DESCIMBRADO Y LIMPIEZA (POR SUPERFICIE DE CONTACTO), P.U.O.T. | M2 | 0.300000 | $102.15 | $30.65 |
| Suma de Auxiliar | $49.36 | ||||
| Costo Directo | $104.15 |