| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 5406-002 | SUMINISTRO Y FABRICACION DE REGISTRO DE ACOMETIDA TELEFONICA DE 1.00 X 1.00 X 1.00 MTS DE CONCRETO ARMADO F C=200 KG/CM2 REFORZADO CON VAR. DEL NO. 3 @ 20 CM EN AMBOS SENTIDOS CON HUECO PARADRENAJE, CON TAPA DE CONCRETO ARAMADO DE 8 CM DE ESPESOR VAR. DEL NO. 4 @ 20 CM CON MARCOP Y CONTRAMARCO DE ANGULO DE 3 1/2 X 1/4" Y JALADERA DE REDONDO | PZA |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| TAPA DE FOFO 84A | TAPA DE FO.FO. 84A | PZA | 1.000000 | $2,638.72 | $2,638.72 |
| ACE#3 | ACERO DE REFUERZO DE 3/8" #3 f`y = 4200 kg/ml | KG | 59.210000 | $7.00 | $414.47 |
| Suma de Material | $3,053.19 | ||||
| Auxiliar | |||||
| EXCAVA-MAN | EXCAVACION POR MEDIO MANUAL EN CEPAS, EN MATERIAL CLASE A, MEDIDO EN BANCO, INCLUYE:MATERIALES MANO DE OBRA Y HERRAMIENTA | M3. | 2.700000 | $114.86 | $310.12 |
| CONCRETO F-C=200 H/O | CONCRETO H.O. F'C=200 KG/CM2, R.N. AGR. MAX. 3/4" | M3 | 0.560000 | $793.01 | $444.09 |
| ACARRE40M | ACARREO HORIZONTAL SIN PENDIENTE. EN CARRETILLA DE 3.5 FT3, A 40.00 M. INCLUYE CARGA Y DESCARGA DEL MATERIAL | M3 | 1.660000 | $35.89 | $59.58 |
| Suma de Auxiliar | $813.79 | ||||
| Concepto | |||||
| PLAN-5 | PLANTILLA DE CONCRETO PREMEZCLADO F'C=100 KG/CM2 DE 5 CMS. DE ESPESOR. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO. | M2 | 2.250000 | $61.74 | $138.92 |
| CIMDA | Cimbra en dados,contratrabes y trabes de liga en cimentación, acabado común, incluye: materiales, acarreos, cortes, habilitados, cimbrado descimbrado, mano de obra, equipo y herramienta (P.U.O.T.). | M2 | 10.340000 | $118.10 | $1,221.15 |
| RELL-EXC | RELLENO TENDIDO Y COMPACTADO AL 95% PVSM CON MATERIAL PRODUCTO DE LA EXCAVACION COLOCADO EN CAPAS NO MAYORES DE 20 CMS. DE ESPESOR. | M3 | 1.040000 | $103.73 | $107.88 |
| Suma de Concepto | $1,467.95 | ||||
| Costo Directo | $5,334.92 |