| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| HAM59 | PINTURA EN TUBERIA DE 25 mm | ML |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| PINTURA SHERWIN | PINTURA SHERWIN | LT | 0.050000 | $51.40 | $2.57 |
| PINTURA SHERWIN | PINTURA SHERWIN | LT | 0.050000 | $51.40 | $2.57 |
| PINTURA SHERWIN | PINTURA SHERWIN | LT | 0.050000 | $51.40 | $2.57 |
| THINER | THINER | LT | 0.025000 | $12.00 | $0.30 |
| THINER | THINER | LT | 0.025000 | $12.00 | $0.30 |
| THINER | THINER | LT | 0.025000 | $12.00 | $0.30 |
| ESTOPA | Kg. | 0.015000 | $16.00 | $0.24 | |
| ESTOPA | Kg. | 0.015000 | $16.00 | $0.24 | |
| ESTOPA | Kg. | 0.015000 | $16.00 | $0.24 | |
| Suma de Material | $9.33 | ||||
| Mano de Obra | |||||
| CUADRILLA BAJA TENS | Cuadrilla No. 32 (1Of. Electricista,1 Ayudantes) | jor | 0.015380 | $745.14 | $11.46 |
| CUADRILLA BAJA TENS | Cuadrilla No. 32 (1Of. Electricista,1 Ayudantes) | jor | 0.015380 | $745.14 | $11.46 |
| CUADRILLA BAJA TENS | Cuadrilla No. 32 (1Of. Electricista,1 Ayudantes) | jor | 0.015380 | $745.14 | $11.46 |
| Suma de Mano de Obra | $34.38 | ||||
| Costo Directo | $43.71 |