| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| GIE-04-01 | TUBO C.G.P.D. 32 MM | PZA |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| SOPORTE P/TUBERIA | SOPORTE P/TUBERIA | PZA | 0.100000 | $32.00 | $3.20 |
| SOPORTE P/TUBERIA | SOPORTE P/TUBERIA | PZA | 0.100000 | $32.00 | $3.20 |
| MATER. MISCELANEOS | MATER. MISCELANEOS | (%)mo | 0.050000 | $0.00 | $0.00 |
| MATER. MISCELANEOS | MATER. MISCELANEOS | (%)mo | 0.050000 | $0.00 | $0.00 |
| TUBO C.G.P.D. 32 MM | TUBO C.G.P.D. 32 MM | PZA | 1.030000 | $52.00 | $53.56 |
| TUBO C.G.P.D. 32 MM | TUBO C.G.P.D. 32 MM | PZA | 1.030000 | $52.00 | $53.56 |
| GUIA ALAMBRE 12 | ALAMBRE PARA GUIA | ML | 1.050000 | $1.66 | $1.74 |
| GUIA ALAMBRE 12 | ALAMBRE PARA GUIA | ML | 1.050000 | $1.66 | $1.74 |
| Suma de Material | $117.01 | ||||
| Mano de Obra | |||||
| CUADRILLA BAJA TENS | Cuadrilla No. 32 (1Of. Electricista,1 Ayudantes) | jor | 0.033330 | $715.38 | $23.84 |
| CUADRILLA BAJA TENS | Cuadrilla No. 32 (1Of. Electricista,1 Ayudantes) | jor | 0.033330 | $715.38 | $23.84 |
| Suma de Mano de Obra | $47.69 | ||||
| Costo Directo | $164.69 |