| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| PLAN-5 * | PLANTILLA DE CONCRETO PREMEZCLADO F'C=100 KG/CM2 DE 5 CMS. DE ESPESOR. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO. | M2* |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CONC.PREMEZ.F-C=100 | Concreto Premezclado resistencia normalF'c=100 Kg/Cm2 A.M. 3/4" | M3 | 0.052500 | $570.00 | $29.93 |
| CONC.PREMEZ.F-C=100 | Concreto Premezclado resistencia normalF'c=100 Kg/Cm2 A.M. 3/4" | M3 | 0.052500 | $570.00 | $29.93 |
| CONC.PREMEZ.F-C=100 | Concreto Premezclado resistencia normalF'c=100 Kg/Cm2 A.M. 3/4" | M3 | 0.052500 | $570.00 | $29.93 |
| CONC.PREMEZ.F-C=100 | Concreto Premezclado resistencia normalF'c=100 Kg/Cm2 A.M. 3/4" | M3 | 0.052500 | $570.00 | $29.93 |
| CONC.PREMEZ.F-C=100 | Concreto Premezclado resistencia normalF'c=100 Kg/Cm2 A.M. 3/4" | M3 | 0.052500 | $570.00 | $29.93 |
| CONC.PREMEZ.F-C=100 | Concreto Premezclado resistencia normalF'c=100 Kg/Cm2 A.M. 3/4" | M3 | 0.052500 | $570.00 | $29.93 |
| POLÍN 3 1/2 X 3 1/2" | Polín 3 1/2 x 3 1/2" x 8 1/4' | pt | 0.120000 | $5.00 | $0.60 |
| POLÍN 3 1/2 X 3 1/2" | Polín 3 1/2 x 3 1/2" x 8 1/4' | pt | 0.120000 | $5.00 | $0.60 |
| POLÍN 3 1/2 X 3 1/2" | Polín 3 1/2 x 3 1/2" x 8 1/4' | pt | 0.120000 | $5.00 | $0.60 |
| POLÍN 3 1/2 X 3 1/2" | Polín 3 1/2 x 3 1/2" x 8 1/4' | pt | 0.120000 | $5.00 | $0.60 |
| POLÍN 3 1/2 X 3 1/2" | Polín 3 1/2 x 3 1/2" x 8 1/4' | pt | 0.120000 | $5.00 | $0.60 |
| POLÍN 3 1/2 X 3 1/2" | Polín 3 1/2 x 3 1/2" x 8 1/4' | pt | 0.120000 | $5.00 | $0.60 |
| Suma de Material | $183.15 | ||||
| Mano de Obra | |||||
| CUADRILLA-SAMS-05 | 1 ALBAÑIL + 1 PEON | JOR | 0.055556 | $617.54 | $34.31 |
| CUADRILLA-SAMS-05 | 1 ALBAÑIL + 1 PEON | JOR | 0.055556 | $617.54 | $34.31 |
| CUADRILLA-SAMS-05 | 1 ALBAÑIL + 1 PEON | JOR | 0.055556 | $617.54 | $34.31 |
| CUADRILLA-SAMS-05 | 1 ALBAÑIL + 1 PEON | JOR | 0.055556 | $617.54 | $34.31 |
| CUADRILLA-SAMS-05 | 1 ALBAÑIL + 1 PEON | JOR | 0.055556 | $617.54 | $34.31 |
| CUADRILLA-SAMS-05 | 1 ALBAÑIL + 1 PEON | JOR | 0.055556 | $617.54 | $34.31 |
| Suma de Mano de Obra | $205.85 | ||||
| Costo Directo | $389.00 |