| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| POST4"03 * | SUMINISTRO Y COLOCACION DE GUARDA RIEL FIJO SOLDADOS, A BASE DE TUBO DE PROTECCION DE 10cms DE DIAMETRO, FIRME PERFORADO CON TALADRO 8" Y ASENTAR LOS TUBOS CON MEZCLA ANTICONTRATIVA. | PZA |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| TUBO CED-40. | TUBO CED 40 DE 1" A 6" | KG | 33.195240 | $5.50 | $182.57 |
| ANGULO DIF.MEDIDAS | ANGULO DIF.MEDIDAS | KG | 22.000000 | $9.15 | $201.30 |
| ACETILENO | ACETILENO | M3 | 0.520260 | $65.00 | $33.82 |
| OXIGENO | OXIGENO | M3 | 0.907530 | $45.00 | $40.84 |
| SOLDADURA E7018 | SOLDADURA E7018 | KG | 1.445130 | $35.00 | $50.58 |
| DISCO ABRASIVO | DISCO ABRASIVO | PZA | 0.086700 | $36.25 | $3.14 |
| CARDA | CARDA | PZA | 0.020220 | $190.00 | $3.84 |
| INGENIERIA | INGENIERIA | KG | 57.805200 | $0.30 | $17.34 |
| SPOT LABORATORIO | SPOT LABORATORIO | KG | 57.805200 | $0.20 | $11.56 |
| FLETES Y MANEJOS | FLETES Y MANEJOS | (%)m | 0.080000 | $0.00 | $0.00 |
| CONC.PREMEZ.F-C=250 | Concreto Premezclado F'c=250 Kg/cm2 T.M.A. 3/4" revenimiento tiro directo | M3 | 0.143400 | $930.00 | $133.36 |
| Suma de Material | $678.36 | ||||
| Mano de Obra | |||||
| CUADRILLA-SAMS-27 | 1 OFICIAL PAILERO + 1 AYUDANTE | JOR | 0.346860 | $651.86 | $226.10 |
| CUADRILLA-SAMS-28 | 1 OFICIAL SOLDADOR + 1 AYUDANTE | JOR | 0.289620 | $651.86 | $188.79 |
| CUADRILLA-SAMS-29 | 1 OFICIAL MONTADOR + 4 AYUDANTES | JOR | 0.069390 | $1,307.82 | $90.75 |
| CUADRILLA-SAMS-04 | 1 ALBAÑIL + 5 PEONES | JOR | 0.240000 | $1,492.14 | $358.11 |
| Suma de Mano de Obra | $863.76 | ||||
| Equipo | |||||
| EQUIPO DE OXICORTE | EQUIPO DE OXICORTE | HR | 0.867060 | $10.82 | $9.38 |
| SOLDADORA EST. | Soldadora Miller Dimension Mod. 652 | HR | 0.277470 | $31.60 | $8.77 |
| ESMERILADORA | Esmeriladora | HR | 0.462450 | $8.24 | $3.81 |
| TALADRO ROTOMARTILLO | TALADRO ROTOMARTILLO MCA. DWALT 5/8"-1/2" | HR | 0.289020 | $18.92 | $5.47 |
| Suma de Equipo | $27.43 | ||||
| Costo Directo | $1,569.55 |